Integrated Prefabricated Pump Station Project in Jiyang District, Sanya
Project Name: Integrated Prefabricated Pump Station in Jiyang District, Sanya
Product specifications: diameter 3000x5550, flow rate 85m ³/h, head 10m, power 4kw
Stainless steel outdoor cabinet, rainproof and anti-theft 4KW variable frequency start, one control two, PLC human-machine interface, GPRS remote control, electrical components using domestic * * trademark 'Chint'.
The nursery area of Linchun Community in Jiyang District is located in a low-lying area with a drainage channel. Sewage is discharged through the channel. Due to long-term discharge of sewage into the channel, the channel is severely silted up and the water flow is poor, resulting in serious deterioration of water quality along the channel, black hair and foul smell, and serious pollution to the surrounding air environment. This affects the appearance of the city, affects the daily life of residents, and brings many inconveniences to their lives.
As Sanya City becomes a pilot city for double repair, the construction of temporary drainage projects in Linchun low-lying areas of Jiyang District is urgent. In order to solve the problem of sewage and rainwater collection in low-lying areas, the area is now being renovated by building new sewage collection pipes along the ditch, and constructing a sewage lifting pump station and temporary interception measures. The sewage discharged into the ditch is collected and lifted into the current municipal sewage pipe, improving the sewage discharge system of the entire area and solving the problem of disorderly discharge of residents' sewage.
The prefabricated pump station customized in this project is mainly used to promote the transportation and discharge of rainwater and sewage in the pipeline network. The project is an integrated prefabricated pump station with a diameter of 3000 × 5550
This project was fully serviced by Yancheng Siyuan from the customization of the plan to the installation and commissioning of the pump station. The project proceeded smoothly and the subsequent commissioning was also smooth.