-
E-mail
hxtysbei@163.com
-
Phone
13703734985
-
Address
West End of Chuangye Road, Muye District, Xinxiang City, Henan Province
Xinxiang Jiachen Environmental Protection Equipment Co., Ltd
hxtysbei@163.com
13703734985
West End of Chuangye Road, Muye District, Xinxiang City, Henan Province
SS300 centrifuge
This model of centrifuge is the smaller model in the three legged centrifuge series, with a bucket diameter of 300mm,compareLarge capacity of 12 kilograms, motor power of 1.1 kilowatts, speed of 1600-1800 revolutions per minute, total weight of approximately 120 kilograms, appearance of approximately 500 * 450 * 450
Working principle of centrifuge
SSTripod stylecentrifugeThe working principle is the same as that of a washing machine spin dryer,It is a machine that uses centrifugal force to separate materials.existpowerfulIn a centrifugal force field,The liquid seeps out of the filter cloth and is converted into liquid. Under the obstruction of the liquid collecting tank of the liquid blocking shell, it flows out of the machine through the liquid outlet pipe, and the solid is trapped on the filter cloth. After stopping the machine, the filter cloth is taken out, and the solid is collected to complete a dehydration process.
Centrifuge operation method
1Place the machine on a level surface, ensuring that the ground is level and even. The power connection method is delta connection. After connecting the power, test the machine once to ensure that the inner container rotates clockwise.
2Place the filter bag inside the inner container, lay it flat, and ensure that the filter cloth is tightly attached to the inner container wall.
3Place the material that needs to be dehydrated evenly and smoothlyLinerInside, pay attentionlevelUniformThe loading amount is strictly prohibited from exceeding the machinecompareLarge capacity.
4Start the machine and wait for about 30 seconds for it to reachcompareHigh speed, if the machine vibrates significantly during this process, immediately disconnect the power and check if the material is flat and uniform. The machine has reachedcompareAfter high-speed operation, a large amount of liquid is discharged from the drainage pipe. After about 2 minutes, the material is basically dry and there is almost no liquid flowing out of the drainage pipe. The power can be turned off. After 1 minute, apply the brake and do not brake it all at once.
5After the machine comes to a complete stop, remove the material and re lay the filter cloth in the inner tank to proceed with the next dehydration process.
6Never put materials into the machine during operation to prevent the high-speed rotating drum from throwing materials out and injuring people.The brake should not be applied all at once, but should be applied several times to stop the machine.