1、 Product Overview
As the name suggests, high and low voltage distribution cabinets are distribution equipment used in power supply systems for energy distribution, control, metering, and cable connection. Generally, power supply bureaus and substations use high voltage switchgear,
Then, the low-voltage side of the transformer is stepped down and led out to the low-voltage distribution cabinet. The low-voltage distribution cabinet is connected to various power distribution panels, control boxes, and switch boxes. Inside, some switches, circuit breakers, fuses
A power distribution device that integrates protective devices such as buttons, indicator lights, instruments, and wires to meet the design functional requirements. Commonly known as high and low voltage switchgear or complete sets of high and low voltage electrical equipment.
2、 Model and meaning
3、 Normal usage conditions
4、 Main technical parameters
rated
insulation level
project
unit
data
Rated power supply
kV
3.6, 7.2, 12
Rated frequency
Hz
50
Rated current of circuit breaker
A
630, 1250, 1600, 2000, 2500, 3150, 4000
Rated current of switchgear
A
630, 1250, 1600, 2000, 2500, 3150, 4000
Rated short-time withstand current (4s))
kA
16. 20, 25, 31.5, 40, 50
Rated peak withstand current (peak))
kA
40, 50, 63, 80, 100, 125
Rated short-circuit openingbreakelectric current
kA
16. 20, 25, 31.5, 40, 50
Rated short-circuit closing current (peak value))
kA
40, 50, 63, 80, 100, 125
1-minute power frequency withstand voltage
interpolarExactlyGround to ground
kV
24, 32, 42
between open contacts
kV
24, 32, 48
Lightning impulse withstand voltage (peak value))
interpolarExactlyGround to ground
kV
40, 60, 75
between open contacts
kV
46, 70, 85
protection grade
The shell is IP4X, and when the compartment and circuit breaker room doors are opened, it is IP2X.
External dimensions
6300~1250A
800×1500(1660)×2300
1600~400A
1000×1500(1660)×2300
● Cable insulation
The switchgear adopts a mid mounted design, resulting in a larger space in the cable room. Current transformer 15 and grounding switch 14 are installed on the rear wall of the compartment, and lightning arrester 12 is installed on the lower part of the compartment. After opening the cabinet door, construction personnel can enter the cabinet from below for installation and maintenance. The cable connecting conductors in the cable room can accommodate 1-3 single core cables per phase. When necessary, 6 single core cables can be connected in parallel to each phase. A detachable non-metallic sealing plate or non-magnetic metal sealing plate with open seams is provided at the bottom of the cabinet where the cables are connected, ensuring convenient construction.
● Relay instrument room
The relay instrument room can be equipped with relay protection components, instruments, live monitoring indicators, and secondary equipment with special requirements. The control line is laid in a sufficiently spacious cable tray with a metal cover plate, which can isolate the secondary line from the high-voltage room. The left cable tray is reserved for controlling the introduction and extraction of small busbars, and the control wires inside the switchgear are laid on the right side. There are also small busbar crossing holes on the top plate of the relay instrument room for easy construction. When wiring, the top cover of the instrument room can be flipped over for easy installation of small busbars

| project |
parameter |
|
| Height B (mm) |
|
2370 |
| Width A (mm) | The rated current of the branch busbar reaches 1250A, and the thermal stability current is 40kA | 650/800 |
| The rated current of the branch busbar reaches 1600A or above | 1000 | |
| Depth C (mm) | Cable inlet and outlet lines | 1500 |
| Overhead incoming and outgoing lines | 1660 | |
The foundation of the switchgear is shown in Table 6 and Figure 4, with "★" indicating the schematic diagram of the transformer cabinet foundation used
Installation of switchgear;
The installation foundation dimensions and installation dimensions of the switchgear (see Figure 5, Figure 6, Table 7, Table 8), (please pay attention to the size prompts for the transformer cabinet foundation used);
When the cabinet is arranged in a single row, the operating corridor in front of the cabinet should be 25 meters. When arranged in a double row, the operating corridor between cabinets should be 3 meters;
According to the engineering requirements and drawings, transport the switchgear to their specific locations. If a row of longer switchgear is arranged (with more than 10 units), the consolidation work should start from the middle part;
When transporting switch equipment, specific transportation tools such as cranes or forklifts should be used, and the use of roller pry bars is strictly prohibited. After the switch equipment is in place on the foundation, the lifting plate and fixing parts should be removed;
On the basis, install switchgear one by one, including both horizontal and vertical aspects, and the unevenness of switchgear installation shall not exceed 2mm;
When the switchgear is fully assembled (spliced), M12 anchor bolts can be used to firmly connect it to the foundation frame or welded to the foundation frame with electric welding.