Electrolytic chlorine dioxide sterilizer

NegotiableUpdate on 02/17
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
Electrolytic chlorine dioxide sterilizer is an electrolytic device that uses special electrodes (titanium based coated with various rare and precious metals such as ruthenium, rhodium, iridium, platinum, etc.) and electrolytic membranes (with imported PVC as the substrate) to electrolyze saturated saline solution. Through a water sprayer, the synergistic disinfectant gas is fully mixed and dissolved with water to produce chlorine dioxide synergistic disinfectant.
Product Details


1Electrolytic chlorine dioxide sterilizerBasic conditions for use

1Environmental temperature:0℃~40℃;

2WaterTemperature:0℃~30℃;

3Water pressure:0.30MPa0.65Mpa

4Pressure at the dispensing port: <0.01Mpa

5There are drainage facilities and good ventilation in the equipment room, and no flammable, explosive or other dangerous goods are allowed to be placed in the equipment room. Not within the equipment roomPeople are not allowed to smoke or use open flames.

6Equipment water quality: meets the requirementsGB5749-2006Standard.

7Quality of salt used for equipment: compliantGB5641-2000Refined salt premium standard in the standard (sodium chloride content not less than99%).

IIElectrolytic chlorine dioxide sterilizerInstallation of

1Install the equipment indoors, as far away as possible from electrical facilities such as distribution cabinets, and place the equipment on a hardened and flat ground.

2The diameter of the pipe isDN25Atmospheric pressure water pipe (water pressure:0.30MPa0.65Mpa)The main inlet pipe on the right side of the equipment(Power Water)Connected; the deviceleftConnect the side dosing tube to the disinfectant dosing point (using the dosing tube)UPVCPipes or other corrosion-resistant pipelines, disinfectant injection point pressure less than:0.01Mpa); Connect the sewage pipe on the right side of the device to the floor drain, drainage ditch or drainage pipe; Pass the two exhaust pipes behind the device through the wall holes and connect them to the atmosphere (the exhaust pipes should be firmly bonded and not leak, and the height of the exhaust pipes from the ground should not be less than2 Rice).

3EquipmentThe soft water inlet in the middle is connected to the outlet of the water softener.

4Equipment power supplypick upEntering into communication380 Voltage source.

3、 Operating procedures

3.1Initial startup operating procedures

3.1.1Open the main valve of the water supply pipeline to the generatorFill the cathode chamber and salt tank with water.

3.1.2Open the salt box inlet valve and cathode box inlet valve on the front operation panel of the device45 Add water to the salt tank and cathode tank until the liquid level reaches the upper limit (not exceeding the upper limit).

3.1.3To power on the device, first ensure that the switch on the operation panel in front of the electrolytic power supply is in the off state, and then turn on the power supplyThe switch is on.

3.1.4unscrewSalt dissolution tankAdd salt to the top opening first50Kilogram of salt, then tighten the salt mouth tightlyFirst, open the salt injection valve and then turn on the salt flushing pump. After the salt * dissolves, close the salt flushing pump and then close the salt injection valve.

3.1.5Turn on the switch on the front panel of the device; Rotate the effective chlorine production setting knob to set the effective chlorine production.

3.1.6Regularly set the cathode discharge and set the timer discharge interval based on the equipment operation.

3.1.7The device can be controlled locally and receive remote contactless signals.

3.2Daily operating procedures

3.2.1Add salt and pass it through the salt box every daySalt observation portCheck if the salt tank is short of salt once, and if it is, add salt to the equipment every time50kilogram, press3.1.4operation.

3.2.2Add water and check the salt box and cathode box for water shortage once a day. If there is water shortage, open the corresponding valves45 Add water to the water deficient container (do not exceed the upper limit of the liquid level).

3.2.3Effective chlorine production setting: Rotate the effective chlorine production setting knob based on the residual chlorine value measured in the factory water and the specific situation of the water supply.Set effective chlorine production (effective chlorine production set value ≈ average hourly water supply tonnage ×2).

3.3Shut down

3.3.1Turn the switch on the front control panel to the off position.

3.3.2Close the main valve of the water supply pipeline to the generator in two hours.

3.3.3Unplug the power plug.

4、 Equipment inspection

This device has the characteristics of simple operation, stable operation, and durability. During normal operation, there is no need for a dedicated person to be on duty, but in order to ensure the long-term stable operation of the equipment, regular inspections are still required to detect problems and solve them in a timely manner.

Observe all piping systems of the equipment for any leaks. If any leaks are found, immediately shut down the machine and carry out repairs.

1.Observe the device indicator lights to see if they are functioning properly. If there are any abnormalities, immediately shut down the machine for maintenance;

2.Observe whether the raw materials are sufficient. When the raw materials are exhausted or insufficient, they should be replenished immediately;

3.Before long-term shutdown, it is necessary toequipmentClear and perform equipment pipeline cleaning and equipment cleaning work, then turn off the power of the equipment;

4.Each devicehalf a yearClean once;

5.The sealing rings and gaskets on the pipeline should be replaced once a year;

6.After repairing, replacing equipment parts or supplementing raw materials, the equipment and surrounding environment should be cleaned in a timely manner;

5、 Daily maintenance and upkeep of equipment

In order to maintain the equipment in good working condition, users are requested to do the following in their daily maintenance and upkeep of the equipment:

1.Check the equipment for normal operation every day;

2.Pay attention to the cleanliness of the filter head, dispensing tube, and one-way valve to prevent blockage;

3.magnetic forceIf there is any leakage in the pump pipeline, immediate sealing inspection and treatment should be carried out;

4.Maintain indoor ventilation at all times to prevent gas leakage and environmental pollution.

6、 Serious commitment

Our company provides free warranty for the equipment sold1Annual, lifelong maintenance of equipment. During the warranty period, our company is responsible for repairing any equipment damage caused by non-human factors, natural disasters, violence, or other reasons.

For service commitments and specific warranty matters, please refer to the "Warranty Form".

Kind reminder again:

1.The regulating valve must be installed on the inlet pipe;

2.When operating related valves, it is necessary to strictly follow the sequence of opening first and then closing;

3.Before each operation of the equipment, it is necessary to strictly check whether the equipment is normal and whether all valves are opened and closed as required;

7、 Emergency situation handling

Precautions for equipment in emergency situations:

When there is an emergency situation in the water supply system, such as sudden power outage, lightning strike, any equipment or component abnormality, or the water supply system cannot operate normally, the dosing equipment should be immediately powered off, and all valves of the dosing equipment and water supply network should be closed.

After the water supply system resumes operation, water customers can open the faucet for observation. If there are any abnormal phenomena, they must immediately report to relevant personnel to confirm that the water supply system and dosing equipment are normal and can be operated. Otherwise, the equipment should be shut down for inspection.