-
E-mail
ence5188@163.com
-
Phone
13585998237
-
Address
Dongjing Industrial Zone, Songjiang District, Shanghai
Shanghai Enze Environmental Protection Equipment Co., Ltd
ence5188@163.com
13585998237
Dongjing Industrial Zone, Songjiang District, Shanghai
NCWEnergy saving and consumption reducing, low noise, simple and practical maintenance!
1.*A fully enclosed straight structure that seals off noise, and a submerged blower that sinks to the bottom of the water. After the noise is absorbed through water barriers, it can be reduced;
2.Less faults: adopting direct power transmission, no need for pulleys, reducing fault factors, automatically stopping operation due to overload and overheating, and automatically resetting;
3.Easy installation: The main body does not require a fixed base, the piping is short, and the installation space is small;
4.Bearings and gears are not easily damaged: The transmission gear is oil bath type, and the upper bearing is lubricated with high-temperature butter, making the bearing less prone to damage after being cooled by water;
5.No need to build a fan room: installed underwater, no need to build a fan room;
6.Uniform aeration:Connect pipelines or aerator plates with openings for aeration;
Working Principle:
NCWThe Enze brand submerged blower is modified from the Roots blower and is a Roots blower specially developed for sewage treatment that can sink to the bottom of the water.fanFor a direct structure, the rotor is a closed non-contact type, and the double axis parallel three blade impeller has a small amplitude and a long bearing life, without the need for a pulley to drive the operation. The submerged blower is installed at the bottom of the water and connected to the pipeline for aeration. The sewage treatment is carried out through aeration reoxygenation method.
Installation method:
Before installing the submerged blower, first conduct an air tightness test on the extension pipe of the submerged blower
After completing the testing, proceed with the following steps for installation:
1Connect the power supply to confirm the forward and reverse rotation of the machine
2Install two inlet and outlet extension pipes, equipped with sealing gaskets
3Conduct an air tightness test on the connection between the extension pipe flange and the muffler flange of the submerged fan
4Use stainless steel chains to lift the submersible motor hoist ring and transport the machine to the fan installation site
5Fixed submersible blower base and extension pipe
6Install inlet muffler and elbow
7Install check valve and three-way valve
8Install the elastic joint and fan main pipe
9Start up and test run



