Welcome Customer !

Membership

Help

Shandong Hongquan Shengde Environmental Protection Technology Co., Ltd
Custom manufacturer

Main Products:

hbzhan>Products

Shandong Hongquan Shengde Environmental Protection Technology Co., Ltd

  • E-mail

    1357613201@qq.com

  • Phone

    15318919761

  • Address

    East End of Yangjialing Village, Mizhou Street, Zhucheng City, Weifang City, Shandong Province

Contact Now

Fully automatic industrial prefabricated pump station

NegotiableUpdate on 02/08
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The fully automated industrial prefabricated pump station has a high degree of integration: components such as water pumps, pipelines, and control equipment are pre integrated into a single overall structure, and on-site installation only requires simple connection and debugging, greatly reducing on-site workload, construction time, and risks, and facilitating automation.
Product Details

Fully automatic industrial prefabricated pump stationIt is a complete set of equipment pre designed, manufactured, assembled, and tested in a factory. It integrates water pumps, pipelines, valves, control systems, liquid level monitoring devices, etc. into one cylinder, and then transports them as a whole to the project site for installation.

Simply put, it is a "plug and play" solution for sewage and rainwater lifting, like a giant "pump house" buried underground.


Fully automatic industrial prefabricated pump stationComparison with traditional concrete pumping stations

feature

Integrated prefabricated pump station

Traditional concrete pump station

construction period

Short (several days to several weeks)

Long (several months)

floor area

small

big

Integration/Quality

High, factory standardized production, stable quality

Low, on-site construction, quality is affected by various factors

Leak resistance

Excellent, seamless overall

Poor, prone to leakage and pollution of groundwater

adaptability

Strong and flexible in design

Weak, difficult to change after being finalized

environmental impact

Small, no dust or noise pollution

Large, severe on-site pouring pollution

Maintenance Management

Convenient, intelligent monitoring, no need for underground maintenance

Complex, often requiring personnel to go down the well, dangerous

service life

Long (about 50 years)

Longer, but prone to corrosion and damage

Key factors to consider in selection

1. Design flow rate (Q): The maximum amount of sewage or rainwater that needs to be increased (m ³/h).

2. Head (H): The total head loss that the water pump needs to overcome, including lifting height and pipeline friction loss (m).

3. Required number of water pumps: usually no less than 2, for maintenance and alternate use.

4. Cylinder diameter and depth: determined based on flow rate, pump size, and burial depth.

5. Control system requirements: whether remote monitoring, data uploading, backup power supply, etc. are required.

6. Inlet water quality: whether it contains a large amount of solid impurities, which determines whether to install a grille and the type of grille.


全自动工业预制泵站