-
E-mail
259665053@qq.com
-
Phone
19355561637
-
Address
Tsinghua Tongfang Technology Building, Haidian District, Beijing
Beijing Qingxiang Technology Research Institute
259665053@qq.com
19355561637
Tsinghua Tongfang Technology Building, Haidian District, Beijing
Glass Pipeline Testing Institution Hardness Testing Material Testing Center
The Clear Analysis Technology Research Institute can provide testing services related to the specific gravity, hardness, density, resin content, water absorption, wear resistance, pore content, surface resistance, volume resistance, etc. of glass pipelines, and provide CMA/CNAS qualification testing reports. The laboratory facilities are complete and the project testing team is strong.
Glass pipeline inspection cycle
Within 7-10 working days after the sample is received (can be expedited), there may be changes based on the sample and its testing items/methods. Specific information needs to be consulted with the engineer.
Glass pipeline inspection related projects
Specific gravity, hardness, density, resin content, water absorption, wear resistance, porosity, surface resistance, volume resistance, breakdown resistance, dielectric constant, arc resistance, specific heat, thermal conductivity, heat distortion temperature, flame resistance, self extinguishing, light transmittance, refractive index, bending strength, tensile strength, compressive strength, impact strength, etc.
Related standards for glass pipeline inspection
1. GB/T 40236-2021 Borosilicate Glass Pipes
2. MNOSZ 15576-1953 Glass Pipe Water Color Detection
3. GOST 24201-1980 Glass Pipe Connections and Fixed Parts technical specifications
4. CTI STD-154-2008 Cooling Tower Long Fiber Wrapped Fiberglass Pipeline System
5. ASTM C1071-98 Standard Specification for Fiber Glass Pipe Lining Insulation Materials (Thermal and Acoustic Insulation Materials)
6. ASTM C1071-00 Standard Specification for Fiber Glass Pipe Lining Insulation Materials (Thermal and Acoustic Insulation Materials)
7. GB/T 19738-2005 Glass equipment, piping and fittings Glass equipment components
Glass pipeline inspection process
1. Communication requirements: Understand the items to be tested and determine the scope of testing;
2. Quotation: Provide a quotation based on the testing items and requirements;
3. Signing: Sign a contract and confidentiality agreement to begin testing;
4. Complete testing: The testing cycle may vary depending on the sample and its testing items/methods. Please consult a testing consultant for specific details;
5. Provide testing reports and provide post service;
The above is an introduction to glass pipeline testing. The Clearing Technology Research Institute is committed to providing technical services such as product development, composition analysis, formula reduction, material chemical testing, industrial diagnostic failure analysis, simulation calculation testing, large-scale instrument testing, and reliability verification. If you have any testing needs, please feel free to consult.



Glass Pipeline Testing Institution Hardness Testing Material Testing Center