-
E-mail
2942709300@qq.com
-
Phone
13631787342,15899943952
-
Address
Antai Building, No.4 Hongbao Road, Dongcheng Street, Dongguan City
Dongguan Haoen Testing Instrument Co., Ltd
2942709300@qq.com
13631787342,15899943952
Antai Building, No.4 Hongbao Road, Dongcheng Street, Dongguan City
HE-GT Drum Drop Testing Machine
onePurpose:
1. It is a device for conducting repeated free fall tests on mobile phones (or other small electronic products).
2Reasonable structure, *, and sufficient applicability to different models of mobile phones.
3. The equipment runs stably, with low noise and maintenance free.
twoStandard basis:
The testing equipment meets the GB/T2423.8-1995 or IEC60068-2-32, Ed2 testing conditions; The manufacturing process of the drum meets the GB/T2423.8-1995 appendix standard.
threeFunction implementation:
1. The drum rotates at a fixed speed of 5 revolutions per minute using an electric motor.
2. Drop height: 500mm for single tube, 500mm and 1000mm for double tube, two workstations working simultaneously.
3. The roller structure ensures that the phone drops randomly, avoiding non-standard friction and collision movements.
4、 Technical indicators:
Specification and model: HE-GT-5100
Number of workstations: Twin tube
Operation method: button
Action execution component: reducer motor (optional speed regulating motor)
Drop height range: 500, 1000mm
Falling rhythm: 5-15 times/minute
Counter: 6-digit
Voltage: 220V
Power: 300W (including motor)
Dimensions: 1200mm * 1500mm * 1200mm
5、 Test process description
Simulate the free fall motion of the mobile phone during user use for testing.
Manually place the phone into the drum → close the transparent cover and protective device → the motor drives the drum to rotate counterclockwise → it falls twice after one rotation.
HE-GT Drum Drop Testing Machine
Operating standards:
1. After each test, the drop arm must be lowered to prevent the spring from being deformed due to prolonged resetting of the drop arm, which may affect its performance
Test the effect. Before each drop, please reposition the motor and stop rotating before pressing the drop button;
2. After the installation of the new machine at the factory is completed, appropriate low concentration engine oil must be added to the sliding round rod. It is strictly prohibited to add rust proof oil or high concentration engine oil
Concentrated engine oil and accumulated corrosive oils.
3. If there is too much dust on the oiling area after a long time, please lower the machine to a lower position, wipe the previous oil, and then restart it
Oiling;
4. The drop machine is a mechanical equipment for impact robbery. When a new machine is used more than 500 times, each screw must be tightened
To prevent malfunctions from occurring
5. The lifting shaft and chain of the testing machine need to be lubricated regularly.
6. The gearbox should change the oil supply every six months.
7. When not working, all power should be cut off to ensure the cleanliness of the lifting shaft.
8. Non operators are not allowed to operate this machine arbitrarily.
