-
E-mail
873036520@qq.com
-
Phone
18764713008,15524223456
-
Address
No. 1-24 Ningyuan Road, Hunnan District, Shenyang City, Liaoning Province (1-15-2)
Liaoning Xinsheng Geological Drilling Engineering Co., Ltd
873036520@qq.com
18764713008,15524223456
No. 1-24 Ningyuan Road, Hunnan District, Shenyang City, Liaoning Province (1-15-2)
How much does it cost to drill a 1500 meter hot spring well
Taking the geothermal development project area as the evaluation object, combined with the drilling, thermal storage engineering, dynamic monitoring and evaluation of geothermal projects, research on thermal storage parameter evaluation is carried out, and a three-dimensional geological model and a numerical model of production and irrigation are established to provide a basis for adjusting development plans, improving geothermal project management level, and achieving production and irrigation balance. The evaluation object is favorable zones or blocks, with a focus on in-depth understanding of thermal storage characteristics and distribution. By using geological, geophysical exploration, drilling, productivity testing and other exploration results, the characteristics, genesis types and spatial distribution of thermal storage are basically clarified, and the distribution areas of favorable thermal storage are determined, providing a basis for geothermal resource evaluation, favorable zone selection and geothermal field discovery. Geothermal exploration uses scientific methods to detect the depth, reserves, properties, flow, and position of underground hot water resources, providing manual data for geothermal drilling. Hot Spring Drilling believes that this is a frame structure composed of giant steel pipes, channel steel, and angle steel welded together. The mast uses the inner grooves of the channel steel on both sides as the power head to move up and down on the track. Hot Spring Drilling believes that this can ensure the verticality of the drilling hole Power head: The power head mainly adopts the mechanism of a gear reducer, and there is a large hole in the middle of the low-speed shaft of the power head. The upper opening of the shaft can be connected to the rubber hose interface of the concrete pouring equipment At the same time, understanding the geological conditions, whether it is suitable for drilling, what drilling technology should be adopted for the corresponding geological conditions, and formulating a reasonable drilling plan. By doing these prerequisites well, we can achieve twice the result with half the effort in geothermal drilling, achieve good results, and ensure the smooth progress of the project.

How much does it cost to drill a 1500 meter hot spring well
Hot spring drilling is a massive project that requires geological exploration to ensure the smooth progress of the drilling project. Knowing the underground geological conditions can increase the drilling speed What factors are related to the drilling construction speed? The structure of geological layers, the degree of wear of drill bits, and other factors can all affect the progress of drilling projects. Therefore, we need to be prepared for these preliminary works to ensure the smooth progress of drilling projects and accelerate construction progress. Drilling rig equipment is a type of vehicle mounted reverse drilling rig. The main transmission of the drilling rig equipment is mechanical transmission, and one part of its operating organization is hydraulic operation, while the other part is mechanical operation. Mud can be used as flushing fluid during reverse drilling of the drilling rig to complete the circulation drilling of the main trench pipe fittings; Reverse drilling can assist in pressurized drilling during the initial stage of drilling to improve the drilling power. As the depth of the hole increases, when the drilling tool exceeds the required pressure, the main winch system can be used to complete depressurization drilling. Before conducting hot spring drilling, it is necessary to conduct a hot spring survey. Hot spring survey can not only help identify the location, reserves, and compensation mode of the hot spring, but also guide the hot spring drilling project through analysis of geological conditions, avoid risks and accidents, and ensure the smooth and safe progress of the project. At the same time, it can serve as a basis for hot spring utilization planning.