How much does it cost to drill a hot spring deep well
Based on the actual situation learned from the preliminary survey, a specific implementation plan will be made. According to the drilling structure design drawing, drilling work will be carried out in the project area, mainly focusing on geothermal energy development The geothermal exploration in the early stage of hot spring drilling is very important. It is a crucial step in determining the success of your drilling, which requires comprehensive geological, geophysical, and geochemical investigations, as well as geological work such as drilling and testing, sampling and testing, and dynamic monitoring Identifying suitable locations for hot spring drilling, developing feasible plans based on actual conditions, evaluating their economic value, and assessing their impact on the surrounding environment are all completed during this period Based on the geological conditions and equipment conditions, the drilling method for hot springs is determined. By using the correct drill bit and adopting the drilling technology reasonably, the production process can be improved, the working hours can be shortened, the labor intensity of drilling workers can be reduced, the mud leakage during the drilling process can be controlled, the cause of mud leakage can be identified, the amount and location of leakage can be determined, and the leakage can be stopped through reasonable means to prevent various problems caused by mud leakage and the circulation of underground hot water The water level drops Collapse occurs, even changing the pressure of underground hot water reservoirs, leading to blowouts

How much does it cost to drill a hot spring deep well
The construction of hot spring wells is a complex project that needs to be carried out step by step. In order to improve the completion rate of hot spring wells, equipment, technology, and drilling process plans should be selected based on the geothermal hot spring exploration results and the geothermal geological conditions. On this basis, drilling construction should be carried out. When implementing the geothermal well according to the drilling process and drilling construction plan, step-by-step and sub item engineering division should be carried out, and process quality control points should be set up to facilitate engineering quality control and later inspection and evaluation. In the engineering process, attention should be paid to real-time monitoring and the installation of underground television and other equipment. Due to the chaotic underground geological conditions, in case of abnormalities, they can be dealt with in a timely manner to avoid accidents and dangers. In order to achieve good water output and temperature in the hot spring well, in the early stage, The survey is correct. We cannot settle things hastily just because we are afraid of trouble and cost. In the early stage of hot spring exploration, when the local geological conditions are relatively complex, surface water may be connected to groundwater. If drilling is directly arranged without detection, there may be hot and cold water flowing through, resulting in insufficient water temperature that determines the overall success of the hot spring well. Scientific and professional hot spring exploration can reasonably avoid the risks of hot spring drilling, including the risks during drilling and whether the drilling is successful in producing water.