-
E-mail
2880581272@qq.com
-
Phone
18860995122
-
Address
No. 5 ASEAN Road, ASEAN Industrial Park, Nanzha Town, Jiangyin City
Jiangsu Ankerui Electric Appliance Manufacturing Co., Ltd
2880581272@qq.com
18860995122
No. 5 ASEAN Road, ASEAN Industrial Park, Nanzha Town, Jiangyin City
Installation of Three phase Multi functional Meter Panel in Intelligent BuildingIntroduction
Programmable intelligent electrical measuring instruments are designed for power systems, industrial and mining enterprises, and public utilitiesfacilityDesigned for the power monitoring needs of intelligent buildings. It can measure all commonly used electrical parameters, such as three-phase current, voltage, active and reactive power, kWh, harmonics, etc. Due to thepower meterIt also has complete communication networking functions, making it very suitable for real-time power monitoring systems.

Beautiful appearance, good texture, and more competitive product.
2. Fixed external port
External terminals and ports are defined in a fixed and standardized manner to reduce the skill requirements of production and after-sales personnel, as well as the risk of instrument damage caused by wiring errors.
3. Laser printing replaces panel pasting
Reduce production and maintenance pressure, avoid risks such as panel pasting errors and incomplete pasting.
4. 72 external current terminal with screw flange
To prevent the hazards caused by loose terminals leading to secondary open circuits in transformers, the product is safer and more reliable.
5. 96 appearance can be directly connected to AC 660V line voltage
Meet the demand for wide voltage direct input
6. Meet the production process of plug-in machines and robotic arms
Improve production efficiency and capacity, and reduce labor costs.
Intelligent building three-phase energy meterTechnical Specifications

Intelligent building three-phase energy meterProduct dimensions

Intelligent building three-phase energy meterNetworking solution

Intelligent building three-phase energy meterProduct Quotation

1. Before use, the instrument needs to be powered on for 15 minutes.
2. Be careful to prevent vibration and impact, and do not use in places with excessive dust and harmful gases.
3. The input wire should not be too long. If the input end of the tested signal is too long, please try it outTwisted pair shielded cable.
4. If the signal is accompanied by high-frequency interference, a low-frequency filter should be tested online.
5. When stored unused for a long time, please power on for at least 4 hours every three months.
6. Long term storage should avoid direct sunlight and be stored at an ambient temperature of -25 ° C~55 ° C
7. If the instrument does not display, the auxiliary power supply should be checked first to ensure that the voltage is within the range.
8. If the display is abnormal, check if the input signal is normal and if the signal terminals are tightened.
9. Unless the PT has sufficient power, the PT signal cannot be used as an auxiliary power source to ensure the normal operation of the instrument.
10. The screws of the current connection terminals in the CT circuit must be tightened to ensure reliable contact between the incoming and outgoing lines, in order to avoid faults.
11. To calibrate instruments, the calibration instrument should be better than level 0.1 to ensure calibration accuracy.