Welcome Customer !

Membership

Help

Shandong Zhongtai Environmental Protection Equipment Co., Ltd
Custom manufacturer

Main Products:

cep-online>Products

Shandong Zhongtai Environmental Protection Equipment Co., Ltd

  • E-mail

    1144804827@qq.com

  • Phone

    13210751895

  • Address

    1.5 kilometers east of the intersection of Beihai Road and Bama Road in Fangcheng Street, Fangzi District, Weifang City, south of the road

Contact Now

MBR integrated sewage treatment equipment supplied to Shandong

NegotiableUpdate on 04/03
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The MBR integrated sewage treatment equipment supplied by Shandong usually includes pre-treatment units (grids, regulating tanks, etc.), MBR biochemical reaction units (anoxic tanks, aerobic tanks, membrane tanks), and post-treatment units (disinfection, etc.). Through the synergistic effect of microbial degradation and membrane filtration, it effectively removes pollutants such as organic matter, suspended solids, and ammonia nitrogen from sewage. Suitable for sudden water pollution incidents or temporary sewage treatment needs, such as emergency response after natural disasters and sewage treatment in temporary activity venues.
Product Details

MBR integrated sewage treatment equipment supplied to ShandongIt is an integrated device that combines membrane bioreactor (MBR) technology with wastewater treatment processes. Its core is to use membrane components (ultrafiltration or microfiltration membranes) instead of traditional secondary sedimentation tanks to achieve efficient solid-liquid separation. The equipment usually includes pre-treatment units (grilles, regulating tanks, etc.), MBR biochemical reaction units (anoxic tanks, aerobic tanks, membrane tanks), and post-treatment units (disinfection, etc.). Through the synergistic effect of microbial degradation and membrane filtration, pollutants such as organic matter, suspended solids, and ammonia nitrogen in sewage are effectively removed.

MBR integrated sewage treatment equipment supplied to ShandongKey techniques for use

  1. Reasonable design: Based on the treatment scale and effluent requirements, design the scale and parameters of MBR integrated sewage treatment equipment reasonably.

  2. Regular maintenance: Regularly maintain the equipment, including cleaning the membrane components, checking the operating status of the equipment, etc., to ensure the normal operation of the equipment.

  3. Optimize operating parameters: Adjust operating parameters such as aeration rate and sludge return ratio in a timely manner based on water quality and treatment effectiveness to improve treatment efficiency.

Notes:

  1. Avoid blockage: Pay attention to avoiding blockage at the equipment inlet and maintain smooth water flow.

  2. Protective membrane components: To prevent physical or chemical damage to the membrane components, regularly inspect and replace them.

  3. Control water quality: Ensure that the water quality entering the MBR integrated sewage treatment equipment meets the equipment requirements and avoids damage to the equipment.

  4. Safe operation: When operating equipment, pay attention to safety protection measures to avoid accidents.

MBR一体化污水处理设备山东供应