The prefabrication of pipelines in the prefabricated high-efficiency room air conditioning chiller industry is of paramount importance for the installation and production of prefabricated refrigeration rooms. During the pipeline prefabrication process, after BIM 3D design and component mechanical process design, precise production methods are adopted, and automatic length determination, cutting, pairing, and welding functions can be achieved using automated production equipment. Prefabricated pipelines can be flexibly assembled and disassembled, with high dimensional accuracy, tight joints, and simple and convenient operation, which can improve project quality, accelerate project progress, reduce on-site pollution and material consumption
Prefabricated high-efficiency computer roomIntroduction
The prefabrication of pipelines in the air conditioning chiller industry is of utmost importance for the installation and production of prefabricated refrigeration rooms. During the pipeline prefabrication process, after BIM 3D design and component mechanical process design, precise production methods are adopted, and automated production equipment can be used to achieve automatic length determination, automatic cutting, automatic assembly, and automatic welding functions. Prefabricated pipelines can be flexibly assembled and disassembled, with high dimensional accuracy, tight joints, and simple and convenient operation, which can improve project quality, accelerate project progress, reduce on-site pollution and material consumption
Prefabricated computer room
Refers to the transportation of prefabricated, installed, and molded factory pipe fittings to the project siteThe installation method of the computer room for on-site assembly according to the components.Compared with traditional computer room installation methods, it has the following advantages:
1. The factory prefabrication has high quality.Assembly of components and modules at the project site, with a large amount of on-site pipeline cuttingCutting and welding work are completed on the factory's automated production lineThe quality and accuracy should be better than manual cutting and welding on site.2. Computer simulation installation has high accuracy.Using BIM modeling optimization, simulate installation in the computer without errors, and thenInstall according to simulated conditions on site to ensure installation accuracy and rationality.
3. The on-site construction period is short.Only flange connection assembly work is carried out on the project site, and it is only a moldThe connection assembly between blocks has fast construction speed and short cycle.
4. On site assembly is safe and environmentally friendly.On site assembly work basically no longer involves welding, cutting, etc., resulting in a large amount of productionPollution and spark work are more environmentally friendly and safer than traditional construction methods,Reduce the incidence of fires and other incidents.