-
E-mail
941593506@qq.com
-
Phone
1516964627915169646279
-
Address
Building 67, 14278 Jiankang East Street, Kuiwen District, Weifang City, Shandong Province
Shandong Runchuang Environmental Protection Equipment Co., Ltd
941593506@qq.com
1516964627915169646279
Building 67, 14278 Jiankang East Street, Kuiwen District, Weifang City, Shandong Province
| brand | Runchuang Environmental Protection | Processing & Customization | yes |
|---|---|---|---|
| processing capacity | 0.5m³/h | Main material | carbon steel |
| pump power | 0.125kw | rated voltage | 220v |
Tumen City Dental Medical Sewage Treatment Equipment

The relevant person in charge of Jinan City introduced that the first phase of the Xiaoqing River project is a comprehensive management of about 13 kilometers of the Linjiaqiao to Jiqing Expressway. At present, an investment of 2.5 billion yuan has been completed, and the river channel expansion and dredging project has been basically completed. The reconstruction of the Binhe South Road pipeline has been basically completed, and the civil engineering is expected to be completed by the end of this month. The first phase of the treatment project will be completed before then. At that time, all the sewage on both sides of the Xiaoqing River will be transported to the factory for treatment, achieving the goal of no sewage entering the Xiaoqing River during the dry season.

Hospital sewage refers to the sewage and feces discharged into the hospital septic tank; After primary or secondary treatment and disinfection, the discharge standards for sewage and sludge are met respectively. Sewage is discharged into the urban sewer network, while sludge is used as fertilizer for farmland. Other pollutants that have not been discharged into septic tanks are not included. The sewage from the infectious disease ward and the general ward of the newly built comprehensive hospital should be separated and disinfected separately.
Based on the fact that medical wastewater contains a large amount of pathogenic bacteria, viruses, insect eggs and other pathogens, as well as chemical agents and radioactive isotopes, which have the characteristics of space pollution, acute and latent infection, and pose great harm, the RC series of small-scale medical wastewater treatment equipment has been developed. The RC series small-scale medical sewage treatment equipment has been applied in medical institutions in multiple provinces, cities, and towns across the country, and has received high praise from customers.
Scope of Application
1. Wastewater treatment for comprehensive medical institutions below the county level or with less than 20 beds, as well as all other medical institutions.
2. The RCXD medical sewage treatment equipment is suitable for medium and small-scale community medical clinics, dental clinics, hospital outpatient clinics, beauty and body care units, and other units that require small-scale sewage treatment due to housing shortages.
3. Central blood station, physical examination center.
4. Small animal husbandry laboratory and operating room sewage treatment.
5. The equipment does not require the construction of a separate water collection tank, and sewage can be directly connected to the equipment inlet. When the water level reaches automatic treatment, the equipment will stop running if the water level is insufficient.
RCXDCharacteristics of series equipment:
1. Small footprint and easy installation
2. Automatic operation, simple operation, and no need for dedicated personnel to manage the entire system
3. The system processing effect is stable and reliable
4. No need to add chemicals, saving subsequent operating costs
5. Beautiful appearance, compact structure, easy to move
6. The equipment can be disinfected using ozone, chlorine tablets or chlorine dioxide disinfectants, and various disinfection methods can be configured according to user requirements.
fiveEquipment technology
The RCXD sewage treatment equipment uses physical or chemical methods to treat sewage (according to user requirements) without the need for adding drugs, and there will be no excessive chlorine emissions, resulting in no subsequent investment costs. The main component of the process is ozone disinfection. Ozone disinfection, its sterilization mechanism is to destroy and oxidize the cell membrane, cytoplasm, enzyme system, and nucleic acid of microorganisms, thereby rapidly inactivating bacteria and viruses. Ozone uses air as raw material and has a killing rate of over 99% against pathogenic microorganisms, bacteria, viruses, etc. contained in medical institution wastewater. The entire equipment has a continuous service life of 30000 hours under standard conditions.
Ozone is composed of an oxygen molecule (O2) carrying an oxygen atom (O), and it is an allotrope of oxygen. Ozone has a strong oxidizing ability, and oxygen atoms can oxidize the cell wall of bacteria until they penetrate the cell wall and form unsaturated bonds with their bodies to take bacterial life. Its function is instantaneous, and the rapid sterilization effect of ozone depends on its high reduction potential. Its function is immediate, and the rapid sterilization effect of ozone is determined by its high reduction potential.
Instructions for use:
1. Connect the sewage to the inlet of the equipment, connect it to an AC220V power supply, and set the controller to automatic mode. The equipment will then operate fully automatically.
2. If the device encounters special circumstances that prevent it from operating, manual control mode can be enabled, and the controller can be put into manual mode. Ozone can be turned on in manual mode.
After sales service commitment
All products sold by our company come with a one-year warranty, lifetime warranty, free design and selection, and free technical consultation.
Company Introduction
Located in the Kite Capital of Weifang, Shandong Province, our company is located in Kuiwen District, Weifang City. We specialize in the research and development, production, sales, and technical services of various water treatment equipment in this city. The company's products combine multiple advantages, with excellent technology and quality. The company has passed the ISO9001-2016 quality system certification.
Our company's chlorine dioxide generators, buried sewage treatment equipment, domestic sewage treatment equipment, reclaimed water reuse equipment, hospital sewage treatment equipment, dosing equipment, and dechlorination equipment have been widely used in various cities across the country. The company adheres to the principle of "quality and reputation" and warmly serves customers. Welcome users to choose, visit and guide us, and sincerely hope to provide valuable feedback on our company's products!
Performance principle:
Safe and reliable; Performance indicators are superior to national standards; High degree of automation; Easy to operate and maintain.
To protect the water quality of Xiaoqing River, the provincial capital will continue to implement sewage interception and treatment measures for Xingji River, Dongluo River, Xiluo River, Quanfu River, Liuxing River, Beitaiping River, Daxin River, and Gongshang River, gradually eliminating direct discharge of urban sewage into urban waterways. In terms of process upgrading and renovation of sewage treatment plants, 280 million yuan has been invested to implement Level A standard upgrading and renovation of the first and second plants of Everbright Water (Jinan) Co., Ltd. The 100000 ton expansion project of the first plant is being accelerated, and it is expected to achieve water supply commissioning by the end of this month; The 20000 ton/day expansion project of Jinan High tech Zone Water Purification Plant is actively under construction and is expected to be completed by the end of the year. In terms of building a new sewage treatment plant, the third plant of 100000 tons/day Sunlight Water (Jinan) Co., Ltd., which invested 150 million yuan, has completed the main project and is expected to achieve water supply and commissioning in the near future; The Suncun Sewage Treatment Plant in the High tech Zone, with a processing capacity of 10000 tons per day, is expected to be put into operation within the year; The sewage treatment plant at Jinan West Railway Station, with a processing capacity of 30000 tons per day, is currently under active construction and is expected to be completed and put into operation by the end of the year.
Tumen City Dental Medical Sewage Treatment Equipment
