-
E-mail
beiteer123@163.com
-
Phone
13356783553
-
Address
Xueguan Road North, South Outer Ring Road East Section, Zhucheng City, Shandong Province, China
Shandong Bettel Environmental Protection Technology Co., Ltd
beiteer123@163.com
13356783553
Xueguan Road North, South Outer Ring Road East Section, Zhucheng City, Shandong Province, China
Product Name: Underground Domestic Sewage Treatment Equipment
1、 Product Overview:
This equipment adopts internationally advanced biological treatment technology. Based on the summary of the operating experience of domestic and foreign domestic sewage treatment devices, combined with our company's own scientific research achievements and engineering practice, we have designed a complete set of organic wastewater treatment devices that can be buried underground. It integrates the removal of BOD5, COD, and NH3-N, with stable and reliable technical performance, good treatment effect, low investment, automated operation, easy maintenance and operation, does not occupy surface area, does not require building, and does not require heating and insulation. Flowers and grass can be planted above the main area without affecting the surrounding environment.
This device is suitable for the treatment and reuse of domestic sewage in residential communities, villages, towns, office buildings, shopping malls, hotels, restaurants, sanatoriums, government agencies, schools, military units, hospitals, highways, railways, factories, mines, tourist attractions, and similar small and medium-sized industrial organic wastewater from slaughter, aquatic product processing, food, and other industries. The sewage treated by this equipment meets the national discharge standards in terms of water quality. Our company can also provide reclaimed water reuse equipment according to user requirements.
2、 Process description:
8、 Basic installation, use, and maintenance:
1. Foundation: If the WSZ series equipment is placed above the floor, only a concrete floor with the same appearance as the equipment needs to be prepared as the foundation. The basic pressure must be greater than 4T/m2, and it is also required to be horizontal and flat.
If the equipment is buried below the floor, the foundation elevation must be less than or equal to the equipment elevation and ensure that there is no water accumulation during rain. The foundation is generally made of plain concrete (whether reinforcement is required depends on the local geological conditions).
2. Installation: According to the installation diagram, place each box in place one by one. The position and direction of the boxes must not be misplaced, and the spacing between them must be accurate. The pipes must be connected properly.
Inject clean water into the equipment and check for any leaks in the pipes. If there are no leaks, cover the area around the box with soil, directly inspect the equipment holes, and level the ground. Connect the control line of the electrical control box to the water pump, and connect the electrical control box to the power supply. When wiring, pay attention to the direction of the fan and motor, which must be the same as the direction pointed by the fan.
9、 Equipment construction:
All pipelines of the equipment are made of PVC or stainless steel, and the connections between pipelines are bonded with PVC adhesive or welded with stainless steel.
Suspended biological fillers are used as biological carriers, with high biomass, easy membrane formation, no balling, and no clogging.