-
E-mail
china@allu.net
- Phone
-
Address
Room 4, No. 639 Yide Road, Zhangpu Town, Kunshan City, Jiangsu Province
Alu Environmental Protection Technology (Kunshan) Co., Ltd
china@allu.net
Room 4, No. 639 Yide Road, Zhangpu Town, Kunshan City, Jiangsu Province
ALLU Soil Improvement System
A complete dry soil mixing system
Basic homework ● Curing homework ● Repair homework
Curing agents are the biggest cost for any soil improvement/soil mixing construction site in most cases.
ALLU can control the transportation of curing agents, mix materials evenly, ensure quality, and save costs for various soil mixing projects.
Used for mixing dry soilALLU Soil Improvement SystemIt consists of three parts and operates in coordination.

ALLU PF 7+7 NextGen 10 bar material tanker truck
–A high-pressure, high-capacity, independent mobile "intelligent" material transport tanker used for dry curing agents.
ALLU Strong Mixing Head
–Hydraulic power hybrid auxiliary equipment installed on excavators
ALLU DAC 2.1 Control System
–A data acquisition and control system, serving as the brain of soil mixing processes,
The DAC system can not only accurately control the pressure feeding tank truck and mixing head according to the set parameters,
You can also provide all necessary reports and proof of how the work was carried out.
The soil improvement system brings benefits to various high moisture soil mixing projects.
It can be used for foundation and roadbed stability work, various solidification applications, as well as remediation of polluted soil and sediment.
Dredging sediment, soft soil, clay, peat, ash pond, waste liquid pond, tailings and sludge,
These are good examples that can be easily handled using this soil improvement system.


ALLU Strong Mixing Head PMX 300
| working depth(meters) | 3 |
| hydraulic-Maximum Pressure (BAR) | maximum pressure350 bar |
| hydraulic-Maximum flow rate (liters/minute) | 300 |
| hydraulic-Maximum power (kW) | 160 |
| torque(NM/RPM) | maximum: 18000 Nmin350 bartime |
| weight(kg) | 2400 |
| host(ton) | 25 – 40 |
ALLU Strong Mixing Head PMX 500
| working depth(meters) | 5 |
| hydraulic-Maximum Pressure (BAR) | maximum pressure350bar |
| hydraulic-Maximum flow rate (liters/minute) | 200 |
| hydraulic-Maximum power (kW) | 160 |
| torque(NM/RPM) | maximum: 18000 Nmin350 bartime |
| weight(kg) | 2800 |
| host(ton) | 25 – 40 |
PF 7+7 double tank transport tanker truck
| weight(1. Empty can -2 Full can (kg) | 1. 22000 |
| Tank truck capacitycubic meter | 2 x 7 |
| Maximum operating pressure(BAR / PSI) | 10 / 145 |
| ground pressure(1. Empty tank 800 MM track shoes 2 500 MM track shoes for empty cans | 1.) 0.68 kilograms per square centimeter 2.) 1.02 kilograms per square centimeter |
| Adjustable feeding capacity of curing agent(kg)/second) | 3 – 15 |
| Specification for curing agent particles(millimeters) | 0 – 2 |
| Maximum feeding distance(1.Three inch hose 2. 2-inch hose) | 1.) 200 meters 2.) 100 meters |
| Supply control and reporting system | Allu DAC.2 |
| hydraulic | Hydraulic compressor, rotary valve, processing valve |
| size longxwidexHeight (millimeters) | 6870 x 3400 x 3300 |
| engine – STAGE V / TIER4F | |
| power(kW/rev) | 110 / 2200 |
| torque(NM/RPM) | 560 / 1400 |
| fuel tank(liters) | 400 |
| compressor | |
| type | screw compressor |
| maximum pressure(BAR / PSI) | 10 / 145 |
| Minimum pressure(BAR / PSI) | 3 / 43.5 |
| power(kWh) | 75 |
| Work pressure outputcubic meter | 11.7 |
ALLU PMX+PF Soil Improvement System - Construction Site Mud Solidification Project