| Fault phenomenon | Root cause analysis | exclusion method |
| Five foot traffic or no surge | 1. Incorrect rotation of impeller 2. Whether the valve is open and intact 3. Blockage of pipeline impeller 4. High stroke 5. High density of pumping medium 6. Damaged sealing ring | 1. Adjust the rotation direction of the impeller in the hole. 2. Check, repair, and eliminate debris. 3. Clean up debris. 4. Change or reduce the head. 5. Use water to knock and wake up low height. 6. Wipe more thoroughly |
| Unstable operation | 1. Unbalanced impeller 2. Bearing damage | 1. Send to the manufacturer for replacement or correct. 2. Replace |
| The pump cannot start | 1. Phase loss 2. One wheel stuck 3. Stator winding burned out | 1. Check electrical appliances and circuits for repair. 2. Remove debris. 4. Repair and update windings |
| excessive current | 1. Low working voltage 2. Blockage of pipelines and wheels 2. High density or blockage of the pumping medium 4. Low head during use | 1. Thickening working voltage 2. Cleaning pipes and impeller blockages 3. Changing density or viscosity 4. Reducing flow rate and increasing head |
| Insufficient pressure | 1. Mechanical seal damage or leakage 2. Cable damage 3. Seal selenium mushroom damage or damage | 1. Replace 2. Replace 3. Replace |
Installation instructions for GW pipeline sewage pump
1.GW vertical sewage pipeline pumpThe pipeline should have its own supporting components, and the weight of the pipeline should not be applied to the pump.
If a check valve is installed on the discharge pipeline of the GW sewage pump, it should be installed outside the intermediate valve.
For the convenience of maintenance and safe use, a regulating valve is installed on the inlet and outlet pipelines of the pipeline sewage pump, and a pressure gauge is installed near the pump outlet to ensure that the pump operates within the rated head and flow range, ensuring the normal operation of the pump and improving its service life.
4. When installing a pipeline sewage pump, the foundation bolts must be tightened to avoid the impact of vibration on pump performance during start-up.
5. In order to prevent the pump from experiencing thermal deformation of the pipeline when transporting high-temperature liquids, the foot bolts of the pump seat should not be fixed. When the pipeline system expands and contracts, the pump should be able to move together with the pipeline.
6. The inlet and outlet connection flanges of GW type unobstructed pipeline pumps shall be designed according to the 684216-84 standard, and the pipeline flanges shall be equipped with the same regulations.
After the installation of the pipeline sewage pump, the pump shaft should be moved, and the impeller should have no friction sound or jamming phenomenon. Otherwise, the pump should be disassembled for inspection and maintenance.
Before installing the GW type vertical sewage pipeline pump, the fastening and damage of the pump and motor should be checked.
Ordering instructions for sewage pumps in Zhongqiu Pump Industry:
1
a. Product name and model of unobstructed pipeline sewage pump
b. Diameter of pipeline sewage pump
c. Lift of unobstructed pipeline pump (m)
d. Pipeline unobstructed discharge pump flow rate
e. Pipeline sewage pump motor power (KW)
f. Pump speed for unobstructed pipelines (r/min)
g. Voltage of pipeline sewage pump [V]
h. Material of GW pipeline sewage pump (cast iron, stainless steel)
i. The medium name, specific gravity, viscosity, corrosiveness, and toxicity used in pipeline sewage pumps
2、 If the design unit has already selected our company's pipeline sewage pump product model, please order directly from the sales department of Zhongqiu Pump Industry according to the vertical sewage pipeline pump model.
3、 When the usage situation is very important or the environment is complex, please provide design drawings and detailed parameters as much as possible, and our technical experts from Zhongqiu Pump Industry will review and control them for you.
Product features of pipeline sewage pump:
1. Strong sewage discharge capacity and no blockage.
2. Reasonable design, small matching motor power, energy-saving *.
3. Adopting wear-resistant mechanical seals.
4. Compact structure, easy to move, simple installation, no need to build a pump room, reducing project costs.
5. Capable of operating within the full head range while ensuring that the motor does not overload.
6. The centerline of the inlet and outlet are aligned and can be directly installed anywhere in the pipeline.
GW vertical sewage pipeline pumpUsage conditions:
1. The temperature of the conveyed medium shall not exceed 80 degrees Celsius.
2. The weight of the conveyed medium is 1-1.3 Kg/dm3.
3. The material of this pump is mainly cast iron and cannot be used to transport highly corrosive liquids.
4. When the water pump is working, the surrounding area of the pump should be well ventilated.
5. 1Cr18Ni9Ti stainless steel material can be used for transporting various corrosive liquids.
If the user has special requirements, please indicate the relevant information of the conveying medium when placing the order, so that our company can provide more reliable products.