-
E-mail
2752921834@qq.com
-
Phone
13401999128
-
Address
Xiongzhou Industrial Park, Liuhe District, Nanjing City
Nanjing Linuo Water Treatment Equipment Co., Ltd
2752921834@qq.com
13401999128
Xiongzhou Industrial Park, Liuhe District, Nanjing City


Structural principle of rotary grille cleaning machine from Nanjing manufacturer
The equipment mainly consists of a frame, a drive mechanism, a coarse and fine toothed rake, a guide mechanism, a chain tensioning mechanism, coarse and fine grid bars, an electric control cabinet, and other parts. This device has two installation forms: 60 degree and 75 degree.
This device combines coarse and fine grids into one, with the coarse grid at the front and the fine grid at the back. The coarse grid intercepts solid floating objects larger than the coarse grid gap in the water, while the fine grid intercepts solid floating objects larger than the fine grid gap filtered by the coarse grid. The toothed rake then retrieves the solid floating objects intercepted by the coarse and fine grids and sends them into the container.

Nanjing manufacturer of rotary grille cleaning machinefeature
1. The combination of coarse and fine grids saves equipment investment and reduces the footprint of a grid well.
2. The coarse and fine grid integrated machine can meet higher requirements for filtration accuracy (small grid gaps can reach 3mm).
3. It has the function of self dumping slag.
3. Adopting a shaft mounted reducer, the transmission mechanism is compact.
4. Adopting motor overload protection device, reliable.
5. Simple operation, low failure rate, and long service life.
6. Simple structure and easy installation and maintenance.
7. High degree of automation, capable of remote monitoring.

According to the equipment wide grid machine, it can be divided into single line GSHZ300-1400 type and parallel line GSHZ1400-3000 type. Selection based on water flow rate and lifting height
Depending on the size of the separated debris, different grilles can be selected accordingly.
Precautions for use
Pre installation inspection: Confirm that the equipment is not damaged during transportation, the verticality and parallelism errors of the grid well meet the requirements, and the position and size of the embedded parts match the drawings.
Running direction calibration: Before starting, manually shake the motor to confirm that the direction of rotation is consistent with the arrow mark, to avoid damage to the rake teeth or grille rod caused by reverse rotation.
Chain tension adjustment: Regularly check the tension of the chain and adjust it as needed after initial operation to prevent slipping or wear due to excessive looseness.
Lubrication maintenance: Add lubricating grease to the rolling bearings every month, and replace the lubricating oil of the gearbox every three months to ensure smooth operation of the transmission components.
Cleaning and blockage prevention: Regularly clean large debris in the front grille pool to avoid affecting the cleaning effect; Clean the discharge plate according to the amount of garbage to prevent blockage.