-
E-mail
info@xaunqd.com
-
Phone
18092379637
-
Address
Building 8, Collaborative Innovation Port, Fengdong New City, Xixian New Area, Xi'an City, Shaanxi Province
Guolian Quality Inspection
info@xaunqd.com
18092379637
Building 8, Collaborative Innovation Port, Fengdong New City, Xixian New Area, Xi'an City, Shaanxi Province
The hazard level determines the depth of detection:
General ProjectPre evaluation filing, independent acceptance of control effect evaluation;
Serious projectPre evaluation review+design review+regulatory department organized acceptance, with a higher frequency of testing (such as once every 3 years for current situation evaluation).
Change needs to be retested:
If significant changes in scale or process lead to an escalation of hazard risks, it is necessary toRe evaluate and retest.
Key points of data compliance:
The detection values need to be comparedOccupational Exposure Limits for Hazardous Factors in the Workplace (GBZ 2.1);
The report must includeSampling point map, instrument calibration record, detection method standard number.
| phase | Detection Type | core mission | output file | regulatory requirements |
|---|---|---|---|---|
| Pre evaluation | Analogous detection | Predicting the types and intensities of hazardous factors | Occupational Disease Hazard Pre assessment Report | General project filing, review of heavy/relatively heavy projects |
| Design of protective facilities | status quo detection | Verify the effectiveness of design protection measures | Special section on protective facility design | Serious projects require review by regulatory authorities |
| Control effect evaluation | on-site testing | Acceptance of actual operational performance | Control Effect Evaluation Report | Self acceptance of general projects, acceptance by regulatory authorities for heavy/relatively heavy projects |
Process leaving tracesSave sampled videos and raw data for future regulatory audits;
Integrate the 'three simultaneities'Merge occupational health and safety facility testing to reduce duplicate costs.
Hazard identification comes first, detection data is centered, and protection is implemented laterThrough standardized testing throughout the entire process, the occupational disease risk chain is blocked from the source, ensuring both project compliance and worker health protection meet the standards.