-
E-mail
18706215899@163.com
-
Phone
18014000526
-
Address
No. 6 Hujing Road, Huqiu District, Suzhou City
Suzhou Tianlu Environmental Protection Technology Co., Ltd
18706215899@163.com
18014000526
No. 6 Hujing Road, Huqiu District, Suzhou City
Tianlu Environmental ProtectionIntegrated sewage treatment deviceFeatures:
1. Buried below the surface, the surface above the equipment can be used for greening or other purposes, without the need for building houses, heating, or insulation.
2. The secondary biological contact oxidation treatment process adopts push flow biological contact oxidation, which has a better treatment effect than mixed or two-stage series mixed biological contact oxidation tanks. And it has a smaller volume than activated sludge tanks, strong adaptability to water quality, good shock load resistance, stable effluent quality, and will not cause sludge expansion. A new type of elastic three-dimensional packing material is used in the pool, with a large specific surface area and easy biofilm formation and detachment by microorganisms. Under the same organic load conditions, it has a high removal rate of organic matter and can improve the solubility of oxygen in the air in water.
3. The biochemical tank adopts the biological contact oxidation method, which has a relatively low volume load of the filling material, and the microorganisms are in their own oxidation stage, resulting in low sludge production. It only takes more than three months (90 days) to discharge the sludge (using fecal trucks to suction or dehydrate into sludge cakes for external transportation).
4. The deodorization method of this buried domestic sewage treatment equipment not only uses conventional high-altitude exhaust, but also includes soil deodorization measures.
5. The entire equipment processing system is equipped with a fully automatic electrical control system and equipment fault alarm system, which operates safely and reliably. Generally, there is no need for dedicated personnel to manage it, and only timely maintenance and upkeep of the equipment is required.

Tianlu Environmental ProtectionIntegrated sewage treatment deviceInstallation and maintenance:
1. Foundation: If the WSZ series equipment is placed above the floor, only a concrete floor with the same appearance as the equipment needs to be prepared as the foundation. The basic pressure must be greater than 4T/m2, and it is also required to be horizontal and flat. If the equipment is buried below the floor, the foundation elevation must be less than or equal to the equipment elevation and ensure that there is no water accumulation during rain. The foundation is generally made of plain concrete (whether reinforcement is required depends on the local geological conditions).
2. Installation: Position according to the installation diagram, and place each box in sequence. The position and direction of the boxes must not be misplaced, and the spacing between them must be accurate, and the pipes must be connected properly. Inject clean water into the equipment and check for any leaks in the pipes. If not, cover the area around the box with soil until the equipment inspection hole is reached, and level the ground. Connect the control line of the electrical control box to the water pump, and connect the electrical control box to the power supply. When wiring, pay attention to the direction of the fan and motor, which must be the same as the direction pointed by the fan.

Our company's main business:
The treatment of exhaust gas and wastewater in industrial and mining enterprises includes smoke removal, dust removal, odor removal, oil removal, and noise reduction. Specializing in odor control during construction decoration, sewage, and garbage treatment processes; Provide users with environmental pollution control technology and project solutions.
The company's continuous introduction of management concepts and various talents has enabled the company to gradually improve and move towards the goal of scientific and rational development. Superior quality, discounted prices, and meticulous service have received high praise from a wide range of users! The company currently holds multiple qualification certificates in mechanical and electrical installation, environmental engineering general contracting, and environmental engineering design, and has a professional construction management team. Welcome all users to call or write to inquire!