PP integrated pump station selection: Compared with PE pump station, nPP pump station has better ring stiffness, comparable to fiberglass pump station, and has good impact resistance and toughness; Can be used in environments ranging from -20 ℃ to 90 ℃, PE/PP materials are non-toxic, harmless, and recyclable.
Product Details

Selection of PP integrated pump station

Integrated PP (polypropylene) pump station

PP pump station has better ring stiffness compared to PE pump station, comparable to fiberglass pump station, and has good impact resistance and toughness; Can be used in environments ranging from -20 ℃ to 90 ℃, PE/PP materials are non-toxic, harmless, and recyclable.

In summary, the development history of integrated pumping stations will include traditional concrete pumping stations, integrated fiberglass prefabricated pumping stations, integrated PE pumping stations, and integrated PP pumping stations. This development trend is also driven by the overall cost of its pumping stations, and the integrated PE and PP pumping stations have lower cost, making them a more cost-effective type of pumping station to achieve the expected results.

Construction plan:

Shou, a manufacturer of integrated prefabricated pump stations, has chosen Qianqiu Environment. Our company has independently developed an underground integrated prefabricated pump station, which is precisely prefabricated in the factory according to specific customer requirements and installed after completion. The cylinder of this integrated product is customized and produced using materials such as reinforced polypropylene (PP), which has strong chemical corrosion resistance. The interior includes water pumps, pipelines, valves, instruments, control equipment, and maintenance facilities, ensuring the cost-effectiveness and operational reliability of the system to a large extent. At present, it is mainly used for the collection and pumping of rainwater/sewage in pipeline networks.

6.jpg

Selection of PP integrated pump station

Technical specifications:

When designing integrated pumping stations, if we use traditional concrete pumping stations, we often encounter problems such as long construction periods and high investment costs, which require the pumping station to occupy less land while meeting the needs of phased construction. Therefore, we need to seek new alternative solutions. The Qianqiu Environmental Integrated Prefabricated Pump Station can be built as needed according to the regional development process, that is, under the condition of meeting the short-term flow, it can be delayed or not built in the later stage, reducing the initial investment and achieving the optimal utilization of resources. In addition, the integrated prefabricated pump station solution also adopts an intelligent monitoring and remote management system for the pump station, which can achieve unmanned remote control without the need for a central control room. Compared with traditional pump stations, it greatly reduces the initial investment and later management costs. Users must choose a good integrated prefabricated pump station manufacturer when choosing.

Application scope:

1、 Collection and transportation of sewage in residential or rural communities;

2、 Collection and transportation of sewage from urban sewage treatment plants;

3、 Collection and transportation of rainwater in low-lying urban areas;

4、 Construction and renovation of municipal sewage pipeline network;

5、 Renovation and expansion of old pumping stations;

6、 The water circulation of lakes;

Key Features:

(1) High strength winding process: computer-controlled winding process is adopted, with glass fiber content accounting for more than 75%, and the wellbore has obtained a national testing report from the testing agency.

(2) Bottom structure design for anti sedimentation and odor prevention of the cylinder: The bottom is designed with computerized fluid technology, ensuring no sediment deposition or odor generation at the bottom.

(3) The anti floating design of the cylinder body adopts the structural design of * and is matched with 2 grouting processes, which can meet the installation requirements under any conditions.

(4) A comprehensive control system: A sophisticated control system that can meet users' remote control and monitoring needs.

7.jpg

Excavation of pump pit:

The excavation method of the pump well (taking into account the stability of the slope, possible drainage methods, etc.) should be suitable for the current soil environment. A small water collection well can be made at the edge of the pit bottom, which can be used at any time to ensure the surface of the pit bottom is covered with ice. Excavation must be carried out according to the design drawings, and an excavation plan must be formulated. During excavation, close attention should be paid to the safety of the foundation pit. The bottom of the pump pit must be dry and free of water. If there is any, appropriate precipitation measures must be taken. Adopt appropriate excavation protection methods to avoid damaging the excavation site? The bottom of the pit should be excavated flat. If necessary, a layer of stone free gravel should be laid and compacted with a compactor to achieve a compaction degree of 90% according to the compaction test results. After the excavation of the pump pit is completed, the installation of the pump station can only be carried out after confirming that the on-site conditions such as the inlet and outlet water pipe connections and the electrical relay are met.

(1) Construct according to the plane position, elevation, and geometric dimensions designed on the drawings;

(2) Extend the foundation pit control pile 2 meters outside the foundation pit and fix it;

(3) Good drainage should be maintained during excavation of the foundation pit, and 7 cakes should be set up outside the pit to facilitate the formation of ice on the foundation;

(4) Use an excavator to excavate to the middle sand layer, remove the upper fill soil, and then backfill with coarse sand to the base elevation.

Bottom preparation:

Flatten the bottom of the well, sand it and compact it. If necessary, lay a layer of stone free gravel layer and compact it with a compactor to achieve a compaction degree of 90% according to the compaction test results. If it is a sensitive foundation, special care must be taken when performing compaction operations. Inspect and confirm that the surface is flat, uniform, and consistent.

8.jpg

Template processing and installation:

The template adopts the Xibu processing template. The thickness, length, and horizontal and vertical ribs of the template are determined based on the size, length, and number of template carvings of the guardrail. The adjacent templates are connected by bolts according to the design drawings and measurements, and the overlapping parts of the templates are sealed with sponge double-sided tape strips. The contact surface between the template and the concrete must be polished smooth to a bright color, and then evenly coated with release agent. The template size must first undergo self inspection by the quality inspector, and then be reported to the supervisor for inspection. Only after passing the inspection can the next step be carried out.

9.jpg

Concrete shall not be concentrated in one place to prevent the formation of undulating interfaces. The pouring time shall not exceed the initial setting time of the concrete, and the distance between the vibrating rod and the side touch shall be maintained at 5-10cm. It is strictly prohibited for the vibrating rod to directly contact the formwork. Each vibration must be carried out until the concrete stops sinking, there are no bubbles in the net, and the surface appears flat and bleeding before the vibration rod can be removed.

Backfilling precautions:

(1) The backfill underground should be tightly compacted, otherwise it will cause stress on the inlet and outlet pipelines, and the internal pipeline tension of the pump station will act on the external pipelines.

(2) When starting backfilling, materials such as sand and gravel cannot be introduced into the tank.

(3) If the cement base is uneven, the pump station will tilt, causing the tank to rupture or leak.

(4) Larger stones falling into the backfill pit can damage the tank if the milk is on the tank wall of the recording station.

(5) The excavation plan is very important, otherwise it may lead to incorrect operations during the excavation work, resulting in the displacement of the cement floor after installation and damage to the pump station. If the plan is not careful during backfilling, groundwater will breed, which may cause the pump station to move up.

Technical Specifications:

component Standard Material Optional materials
cylinder Reinforced polypropylene (PP) Polypropylene (PP)
Top of the wellbore Reinforced polypropylene (PP) Polypropylene (PP)
Top cover (manhole) aluminum alloy GRP
armrest Stainless steel (SUS304)
ventilation duct Stainless steel (SUS304)
pipeline Stainless steel (SUS304) PVC
check valve Rubber sheet cast iron valve body
gate valve Rubber sheet cast iron valve body
flexible joint Hot dip galvanized flange/rubber
water pump Cast iron (HT250)
Coupling device Cast iron (HT250)
Guide rail/guide rod Stainless steel (SUS304)
ladder climbing aluminum alloy GRP
Maintenance platform hot-dip galvanized steel GRP
Crushing grid Cast iron shell alloy blade
Basket grille Stainless steel (SUS304)
bolt and nut Stainless steel (SUS304)
pressure plate Cast iron (HT200)
fastener hot-dip galvanized steel
Electric control cabinet shell Stainless steel (SUS304) powder-coated carbon steel

Design selection:

Pump station type Cylinder diameter (mm) Inlet flow rate (m3/d) Cylinder height (m) Number of water pumps (unit)
Small pump station 1000 ≦1000 1.2/2.4 1/2
1200 ≦2000 ≦6 1/2
1600 ≦6000 ≦12 1/2
Large and medium-sized pump stations 2000 ≦10000 ≦12 2/3
3000 ≦35000 ≦12 2/3/4
3800 ≦86000 ≦12 2/3/4
4000 ≦100000 ≦12 2/3/4
customization ≦120000 ≦16 2/3/4

Since its establishment, Qianqiu Construction has been committed to the research and development of integrated pump station equipment, and is committed to providing users with excellent integrated pump station solutions. Our company provides rainwater collection and utilization solutions to customers with effective, reliable, and economical products, as well as professional and enthusiastic installation and service. Qianqiu Environmental Construction has rich design and construction experience, with customers covering all parts of the country and receiving continuous praise from customers.