TSTTunnel Geological Advance Prediction SystemUsed for highway, railway tunnels, and hydroelectric tunnelsUnderground engineering such as underground mines and subwaysgeological hazardAdvanced detection. the partyIt is adoptedWave field separation and surrounding rockwave velocity分析的超前forecasttechnology automaticdata processingFunction improves work efficiencyRate andaccuracyconfigurableelectric sparkSource or handheldShock source, suitable forTBMtunnel
TSTTunnel Geological Advance Prediction SystemThe technology uses wavefield separation to extract the leading echo from the frontforecast system,Can effectively avoid false alarms and false positives,Ensure the reliability of advance forecasting.
◆Distinguish echoes from different directions to avoid false alarms
◆Scan and determine the wave velocity distribution of the surrounding rock in front of the palm
◆Provide geological interface and surrounding rock wave velocity distribution images
◆automaticwave velocityScanning technology improves work efficiency and reduces reliance on personnel experience
◆Only extract the echo in front of the palm face for advanced prediction, with a low false alarm rate
◆地震波scatteringPrinciples for Karst、goaf、Isolated geological bodies such as solitary rocks are sensitive
Energy saving and environmentally friendly, no consumables, low usage cost
◆TSTTunnel Geological Advance Prediction System- Multi purpose, can be used for underground disease detection, the system host can be extended to connect air coupled detector strings, for underground cavities、Lonely Stone、goaf、Explore caves and other areas,Depth up to 30m.
Forecast distance |
200rice |
Scaling up low values in forecasting |
1rice |
A/Ddata conversion |
24bit |
Number of collection channels (expandable) |
24/26 |
Frequency bandwidth |
0.5-5000HZ |
Sampling rate (all channels connected) |
6subtle |
sampling time |
400s |
working method |
Wired or wireless |
The project is located in the Himalayan orogenic belt, with developed faults and folds, interbedded sandstone/mudstone, and complex and variable geological conditions of the tunnel. The tunnel diameter is 8.5m and the length is 11.2km constructed using a shield tunneling machine (TBM). To ensure construction safety, TST is applied for geological advance prediction.