Underground rainwater collection pump station

NegotiableUpdate on 04/02
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The underground rainwater collection pump station has a very small cylinder volume, but it has excellent effective capacity for use, and its integration degree is particularly high, making it a truly integrated equipment. The pump pit adopts fluid design, with good flow state, no blockage, self-cleaning function, ensuring long-term use without problems.
Product Details

Underground rainwater collection pump stationThe volume of the cylinder is very small, but it has excellent effective capacity for use, and its integration degree is particularly high, making it a truly integrated device. The pump pit adopts fluid design, with good flow state, no blockage, self-cleaning function, ensuring long-term use without problems. It can be equipped with high-quality and high-performance submersible sewage pumps, which monitor the use of the equipment 24 hours a day through sensors throughout the body, reducing maintenance costs.

Due toUnderground rainwater collection pump stationIt is a device for collecting rainwater and sewage, which can produce high concentrations of toxic gases such as carbon monoxide and hydrogen sulfide over a long period of time, and may seriously endanger people's safety. So personnel who need to go underground for maintenance must pay attention to the following precautions:
1. Requirements for underground personnel
The first personnel to enter the pump station must be professionals and must receive safety education; At the same time as the homework personnel go down the well, at least 2 people must supervise the entire process, and the supervisors must not leave their posts without permission.
2. Preparation before going underground for work
Ventilation work should be done at least 2 hours in advance before the homework, opening the manhole cover and ventilation system until the homework is completed; At the same time, warning signs should be placed around the pump station before starting work to prevent pedestrians from falling into the pump pit; In addition, the safety equipment of the staff must be complete, including gas masks, gloves, safety ropes, gas detectors, etc.
3. Precautions for underground operations
Underground work mainly avoids safety issues such as toxic gases and power sources. During the homework period, hydrogen sulfide and carbon monoxide gas detection must be conducted every half hour to ensure normal underground air. If there are any abnormalities, emergency measures must be taken; Smoking and open flames are strictly prohibited underground to avoid bringing flammable and explosive materials into the pump station. If welding equipment with open flames is required for operation, sufficient ventilation must be carried out; When in contact with rotating or electrified machinery such as crushing grids, it is necessary to ensure that the power is disconnected, and it is strictly prohibited to carry out electrified operations underground.