-
E-mail
dongweijx@126.com
-
Phone
18600891750
-
Address
4th Floor, Building 15-2, Ronghui Garden, Shunyi District, Beijing
Beijing Xinjing Horticulture Co., Ltd
dongweijx@126.com
18600891750
4th Floor, Building 15-2, Ronghui Garden, Shunyi District, Beijing
Comprehensive service provider for water environment ecological governanceCooperation model
1. Process package:
We provide a complete set of technical process packages, including process technology, design parameters, and equipment supply, and assume corresponding technical responsibilities
2. Upgrading and transformation of construction general contracting technology
We accept the owner's commission to undertake the general contracting of the procurement and construction of the engineering project, and are fully responsible for the quality, safety, schedule, and cost of the contracted project
3.EPC+O
We provide the design, procurement, construction, and post operation of engineering construction projects, and are fully responsible for all aspects of the construction process. After the operation period ends, we hand over the project to the owner
4.BOT
We will invest in construction and operate it during the franchise period, providing operational services. The customer will pay for the operational fees, and the project will be handed over upon maturity
5. Operation services
We accept the client's commission to operate, achieving the separation of property rights and operating entities, and facilitating the transfer and separation of pollution responsibility and pollution control responsibility
Comprehensive service provider for water environment ecological governancepractical case
Ordos Bojiang Haizi Mine
Project location: Bojianghaizi Town, Dongsheng District, Ordos City, Inner Mongolia Autonomous Region. Scale: 20000 tons/day. Emission standard: Surface Class III.
Comprehensive Management of Rivers in Fuzhou City
Project Location: PPP Project for Comprehensive Management and Operation Maintenance of Longjin Yangqi Water System in Cangshan, Fuzhou City, Fujian Province
Complete set of spraying equipment for Mars coal yard in Indonesia
Project location: The Indonesian project is designed and purchased by Shanghai Dingxin Investment (Group) Co., Ltd. and China National Chemical Second Construction Engineering Co., Ltd., with a total of 50 sets of SR150 and N800-80 solenoid valves.
Tuojiang River Basin, Neijiang City
Project Location: PPP Project for Comprehensive Management and Operation Maintenance of Water Environment in Tuojiang River Basin, Neijiang City