-
E-mail
2425638749@qq.com
-
Phone
13962027136
-
Address
No. 79, No. 3 Road, Private Industrial Park, Jianhu County, Yancheng City, Jiangsu Province
Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd
2425638749@qq.com
13962027136
No. 79, No. 3 Road, Private Industrial Park, Jianhu County, Yancheng City, Jiangsu Province
Fuzhou City Underground Box Pump Integrated Fire Pump Station 1
Most of the integrated fire pump stations use buried box pumps, and our company is also one of the pump station suppliers. If you need to learn more, you can consult online or offline directly!
1、 Construction preparation:
1. Familiar with the relevant requirements of the drawings.
2. Collect materials and prepare them according to the requirements of the drawings.
3. Organize construction personnel, implement the project leader in detail, and complete safety technical disclosure work during on-site operations. Construction site manager:
4. Check the construction equipment and prepare labor protection equipment.
5. The project leader shall hand over and inspect the equipment foundation with the construction site supervision department.
2、 Quality assurance measures
1. The quality manager shall track, supervise and strictly implement the GB/T1991-2000ISO9001:2000 quality management policy on site.
2. Strictly follow the drawings and keep self inspection records for each process.
3. The project leader shall report to the engineering supervision department in four steps: material inspection → concealed engineering water tank base inspection → structural and semi-finished product acceptance → finished product acceptance.
4. Quality objective: Achieve a pass rate of 100% and an excellent rate of over 95%.
Fuzhou City Underground Box Pump Integrated Fire Pump Station 1
3、 Security guarantee
1. Conduct on-site safety briefing and sign a safety responsibility agreement.
2. Resolutely obey the leadership of the on-site general contractor and strictly abide by the rules and regulations of the general contractor.
3. Civilized construction should ensure that the site is clean and hygienic, and materials are neatly stacked.
4. Ensure proper safety protection facilities and equip with personal protective equipment.
5. Implement a safety manager to ensure safe production and civilized construction.
Most of the integrated fire pump stations use buried box pumps, and our company is also one of the pump station suppliers. If you need to learn more, you can consult online or offline directly!