-
E-mail
2425638749@qq.com
-
Phone
13962027136
-
Address
No. 79, No. 3 Road, Private Industrial Park, Jianhu County, Yancheng City, Jiangsu Province
Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd
2425638749@qq.com
13962027136
No. 79, No. 3 Road, Private Industrial Park, Jianhu County, Yancheng City, Jiangsu Province
Integrated manufacturer commissioning service for buried box pumps
The development of the market originates from the needs of customers. When the local space no longer meets the needs of users, how to save space more has become the direction for enterprises to consider. Due to limited installation space, the underground installation method emerged naturally. But if the fire water supply equipment is buried underground and solves the problem of land occupation, how should the corresponding series of problems be solved? For example, what if the water tank leaks after being buried underground? What should I do if the water tank is deformed? What should I do if the water tank is corroded by soil? How many earthquakes can the water tank withstand? Can places with abundant groundwater be guaranteed not to float up? These series of questions pose a new direction for the integrated production of buried fire box pumps by manufacturers. In the past few years, it should be seen that the technological development trend of the integrated buried box pump industry is increasingly consistent with the global water supply equipment industry. However, the overall technical level is relatively low, and in the product field with high content of high, precision, and cutting-edge technology, there is no demand for water supply equipment products. In the past few years, the industry's focus has been more on anti buoyancy and anti compression, and this problem has gradually been solved. At present, the most commonly used integrated pump station is the anti floating buried fire box pump station, which is also known as the bottomless fire pump station, which can effectively prevent the pump station from floating up. These are not problems,Integrated manufacturer commissioning service for buried box pumpsWaiting for after-sales service.
The buried integrated water supply equipment is a complete set of integrated equipment, mainly including prefabricated water tanks and integral pump rooms. The quality and installation of the water tank directly affect the service life of the entire pump station to a certain extent. Therefore, the selection of water tank materials and experienced installation teams must be taken seriously. There is currently a new type of integrated water supply equipment for buried box pumps, which uses a large module water tank without connections or horizontal connections, which effectively increases the spacing between water tanks and truly achieves energy conservation, environmental protection, and safety. Simply put, the entire pump station is an integrated fire box pump. The new direction of integrated development of buried fire box pumps is oriented towards user needs. The popular anti floating buried box pump integrated fire pump station in the current market has received widespread praise and recognition. Its installation characteristics are as follows:
(1) The composite BDF module is made of hot-dip galvanized steel plate 3mm and 0.4mm 304/2B food grade stainless steel plate, which are pressed and formed by equipment to achieve a tight fit and meet the requirements of steel plate material strength and stainless steel corrosion resistance.
(2) After compression molding, punching molding is carried out through equipment to meet the assembly requirements of standard modules.
(3) On site assembly and selection of 10 # national standard hot-dip treatment for foundation channel steel, combined with a spacing of 1 meter between each beam, and so on.
(4) Assemble according to the atlas and technical requirements, and assemble them with 10 * 30 hot-dip galvanized screws and environmental protection, water resistance and anti-aging adhesive strips. After the water tank is assembled and formed, install the tie bars and top columns. The reinforcement is selected to be hot-dip galvanized with a diameter of 48, and it is installed horizontally and vertically at a distance of 1 meter. The top pillar is made of 48 hot-dip galvanized pipes, with 4 pipes per square meter evenly distributed for sealing treatment.
(5) Install the pump room according to the pump station, inspect and accept the screws on the surface of the pump room after installation, and ensure that all fasteners are tightened without any omissions.
(6) Clean up all remaining accessories and garbage in the water tank.
