-
E-mail
2881068607@qq.com
-
Phone
18721098757
-
Address
No. 253 Yulu Road, Jiading District, Shanghai
Ankerui Electric Co., Ltd
2881068607@qq.com
18721098757
No. 253 Yulu Road, Jiading District, Shanghai
The MID certification of the electricity meter marks that it has successfully passed the strict certification process of the EU Measuring Instruments Directive (MID). As a mandatory certification system for measuring instruments implemented by the European Union, MID certification aims to ensure that measuring instruments in the EU market meet uniform high standards, effectively protecting the legitimate rights and interests of consumers and further promoting trade liberalization and facilitation.MID certified electric meter
In order to regulate the market for measuring instruments and eliminate technical barriers among member states, the European Union officially issued the MID Directive in 2004 (initially Directive No. 2004/22/EC), which was fully enforced on October 30, 2006. The core mission of MID certification is to ensure that every measuring instrument has a high degree of accuracy, reliability, and compliance, to create a fair and unified market competition environment for manufacturers, and to build a solid protection barrier for consumers' interests.

GB/T 17215.321-2021 Electrical measuring equipment (AC) - Special requirements - Part 21: Static active energy meters
GB/T17626.2-2006 Electrical compatibility testing and measurement techniques - Electrostatic discharge immunity test
GB/T17626.4-20 Electromagnetic compatibility testing and measurement techniques - Electrical fast transient burst immunity test
GB/T17626.5-2008 Electromagnetic compatibility testing and measurement techniques - Surge (impact) immunity test
GB/T 22264.1-2008 Installed digital display electrical measuring instruments Part 1: Definitions and general requirements
GB/T 22264.8-2009 Installed digital display electrical measuring instruments Part 8: Recommended test methods
GB/T 17215.322-2008 Special Requirements for AC Measuring Equipment Part 22: Static Active Energy Meters
GB/T 17215.211-2021 "Electrical measuring equipment (AC) - General requirements, tests and test conditions - Part 11: Measuring equipment"
DL/T 645-2007 Multi functional Energy Meter Communication Protocol
Support full power parameter measurement (U, I, P, Q, S, PF, F); And 2-31st harmonic measurement;
Support bidirectional active and reactive energy measurement, and support multi rate energy statistics for 8 sets of time period meters, 8 time zones, 14 daily time periods, and 5 rates;
Supports 4 typesStatistics of demand and occurrence time;
Support historical electricity consumption for the past 48 months and 90 days (including electricity consumption at various rates);
12 bit segmented LCD display, backlight delay off time can be set; LCD displays information such as electrical parameters, energy values, quadrants, etc;
The Modbus RTU protocol/DL/T645-07 protocol is adaptive, with baud rates adjustable from 1200bps to 38400bps and parity bits adjustable;
