Intelligent upgraded medical sewage treatment equipment, integrating process and IoT technology. Realize automated operation, remote monitoring, and early warning, greatly improving processing efficiency and stability. Effectively dealing with complex medical wastewater (containing bacteria, toxins, and organic matter), ensuring standard discharge, reducing operation and maintenance costs and risks, is an ideal choice for modern hospitals/clinics.
BSCY-B equipment
Equipment features:
1. Pipeline liquid level sensing control, equipment realizes automatic operation of pipelines with water and automatic standby without water;
2. The entire system runs automatically without the need for dedicated personnel to manage it;
3. PLC full touch control screen, with simpler operation settings and less screen burn-in;
4. No need to build a water tank, equipment comes with a sewage treatment tank, saving costs;
5. Ozone oxidation disinfection and sterilization, with a sterilization rate of up to 99% and even better disinfection;
6. No need to add chemical agents, safer and more hygienic operation;
working principle:
Ozone disinfection, its sterilization mechanism is to destroy and oxidize the cell membrane, cytoplasm, enzyme system, and nucleic acid of microorganisms, thereby rapidly inactivating bacteria and viruses. Ozone is made from electrolyzed air as raw materialThe killing rate of pathogenic microorganisms, bacteria, viruses, etc. contained in medical institution wastewater.
BSCSmall scale medicalThe sewage treatment equipment uses physical methods to treat sewage, without the need to add drugs, and there will be no excessive chlorine emissions, without incurring subsequent investment costs. The entire equipment runs fully automatically without the need for personnel management and maintenance.
Installation requirements
1. The equipment should be installed indoorsbestAvoid direct sunlight for equipment operationtemperatureEnvironmental Requirementsnot less than0℃。
2. There should be a 220V power socket and good ventilation at the installation site of the equipment.
3. Ground between devicesas much as possibleLaying cement flooringorTile laying(Make sure to level the ground).
Installation program and precautions
1. Installation program
As the equipment is already assembled before leaving the factory, only the position needs to be selected and the inlet and outlet water pipelines need to be connected properly during installation.
2. Installation precautions
The installation location of the equipment should generally be chosen to be close to the water source and easy to operate. During installation, attention should be paid to leaving a certain amount of maintenance space for easy maintenance.
For components that have already been installed at the factory, they should be rechecked after opening the box, and loose components should be tightened.
Preparation and inspection before use
1. Open the device cover and check if the connection positions of each component are loose.
2. Power on the device and check if the self-priming pump and other electrical components are working properly (just tap).
3. Long term operation of an empty aircraft is strictly prohibited.