-
E-mail
774019401@qq.com
-
Phone
13785680569,13784786670
-
Address
Biyanma Industrial Zone, Dacheng County, Langfang City, Hebei Province
Dacheng County Biyan Majinmin Thermal Insulation Equipment Factory
774019401@qq.com
13785680569,13784786670
Biyanma Industrial Zone, Dacheng County, Langfang City, Hebei Province





Mold box pouring, pipeline joint pouring, and joint patching machine
medium-sizedpolyurethanehigh pressureJoint patching machine
The automatic feeding motor is1.5kwEquipped with a gear pump and high suction power
The material tank is a double-layer tank, with water injected in the middle and a heating tube at the bottom. By heating the water, the material liquid is alerted and heated (the heating tube is1.5kw)
Single material tank can hold loading liquid200kilogram
The material tank is equipped with a liquid level display, which can monitor the amount of material liquid at any time
The bottom of the material tank is equipped with a filter, which is connected to the material pump
The material pump is5.5kwMotor, equipped with high-pressure plunger pump25mlThe individual flow rate is0.3Kilograms per second
Can adjust the flow rate
The fuel tank is equipped with oil circuit blocks, solenoid valves, pressure regulating valves and other components
Factory configuration18High pressure pipeline, no cleaning injection head (injection head needs to be connected)4Root pipeline)
Dashboard configuration
Observe the oil pressure of the oil pump and the material pressure of the material pipe when three shock resistant oil pressure gauges are working
Temperature control meter: MaterialATemperature, materialBTemperature,
Time relay (used to set the injection time)
Knob: AddAStart, addBstart
Button: Oil pump start, oil pump stop, material pump start, material pump stop
The operation process is as follows:
Open the knob and addAStart up, upAStart the material pump and proceed with the materialAInject, close addAStart up, upAMaterial pump stopped
Open the knob and addBStart up, upBStart the material pump and proceed with the materialBInject, close addBStart up, upBMaterial pump stopped
Addition completed
1.Start the oil pump,
2.The feed pump starts and the time relay starts reading seconds. When the set time is reached, the feed pump stops,2sPost exemption
Clean the injection head and return it to its original position
3.Stop the oil pump
Operation completed
Mold box pouring, pipeline joint pouring, and joint patching machine
Equipment time setting: lifting time, pouring time, and returning time
Lifting time: Set the lifting time to ensure that the injection head lifts the rod within the set time. Expose the gap and wait for pouring
Pouring time: Different pouring times are set according to the size of the pipeline. The material pump runs simultaneously and stops at the arrival time
Return time: After the discharge is completed, it is necessary to wait for time to avoid returning the rod immediately, which may cause pressure in the material tank