Welcome Customer !

Membership

Help

Dacheng County Biyan Majinmin Thermal Insulation Equipment Factory
Custom manufacturer

Main Products:

cep-online>Products

Dacheng County Biyan Majinmin Thermal Insulation Equipment Factory

  • E-mail

    774019401@qq.com

  • Phone

    13785680569,13784786670

  • Address

    Biyanma Industrial Zone, Dacheng County, Langfang City, Hebei Province

Contact Now

Mold box pouring, pipeline joint pouring, and joint patching machine

NegotiableUpdate on 05/14
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Mold box pouring, pipeline joint pouring, and joint filling machine. The material pump is a 5.5kw motor, equipped with a high-pressure plunger pump of 25ml and a single flow rate of 0.3 kilograms per second. The automatic feeding motor is a 1.5kw motor, equipped with a gear pump and high suction. The material tank is a double-layer tank, with water injected in the middle and a heating tube at the bottom, which heats up the material liquid through water (the heating tube is 1.5kw)

Product Details

Mold box pouring, pipeline joint pouring, and joint patching machine

medium-sizedpolyurethanehigh pressureJoint patching machine

The automatic feeding motor is1.5kwEquipped with a gear pump and high suction power

The material tank is a double-layer tank, with water injected in the middle and a heating tube at the bottom. By heating the water, the material liquid is alerted and heated (the heating tube is1.5kw

Single material tank can hold loading liquid200kilogram

The material tank is equipped with a liquid level display, which can monitor the amount of material liquid at any time

The bottom of the material tank is equipped with a filter, which is connected to the material pump

The material pump is5.5kwMotor, equipped with high-pressure plunger pump25mlThe individual flow rate is0.3Kilograms per second

Can adjust the flow rate

The fuel tank is equipped with oil circuit blocks, solenoid valves, pressure regulating valves and other components

Factory configuration18High pressure pipeline, no cleaning injection head (injection head needs to be connected)4Root pipeline)

Dashboard configuration

Observe the oil pressure of the oil pump and the material pressure of the material pipe when three shock resistant oil pressure gauges are working

Temperature control meter: MaterialATemperature, materialBTemperature,

Time relay (used to set the injection time)

Knob: AddAStart, addBstart

Button: Oil pump start, oil pump stop, material pump start, material pump stop

The operation process is as follows:

Open the knob and addAStart up, upAStart the material pump and proceed with the materialAInject, close addAStart up, upAMaterial pump stopped

Open the knob and addBStart up, upBStart the material pump and proceed with the materialBInject, close addBStart up, upBMaterial pump stopped

Addition completed

1.Start the oil pump,

2.The feed pump starts and the time relay starts reading seconds. When the set time is reached, the feed pump stops,2sPost exemption

Clean the injection head and return it to its original position

3.Stop the oil pump

Operation completed

Mold box pouring, pipeline joint pouring, and joint patching machine

Equipment time setting: lifting time, pouring time, and returning time

Lifting time: Set the lifting time to ensure that the injection head lifts the rod within the set time. Expose the gap and wait for pouring

Pouring time: Different pouring times are set according to the size of the pipeline. The material pump runs simultaneously and stops at the arrival time

Return time: After the discharge is completed, it is necessary to wait for time to avoid returning the rod immediately, which may cause pressure in the material tank