-
E-mail
774019401@qq.com
-
Phone
13785680569,13784786670
-
Address
Biyanma Industrial Zone, Dacheng County, Langfang City, Hebei Province
Dacheng County Biyan Majinmin Thermal Insulation Equipment Factory
774019401@qq.com
13785680569,13784786670
Biyanma Industrial Zone, Dacheng County, Langfang City, Hebei Province




Polyurethane joint patching machine is used for interlayer filling and insulation pouring
Polyurethane high-pressure joint patching machine is mainly used forPolyurethane pipeline joint patching and joint work
Small box sandwich insulation pouring Insulation filling of gaps in board materials Small flow injection head is movable
The size of the polyurethane high-pressure joint patching machine is850*1350*1400, after shrinking in size, it is easier to transport in a single row, reducing the loading area and allowing for more materials to be loaded when going out
The configuration of the polyurethane high-pressure joint patching machine is
2.2kw oil pump motor,
4kw material pump motor configuration16Ml high-pressure plunger pump, with a unit flow rate of0.25kilogram/Second
1.5kw automatic feeding motor
Single material tank can hold200kg of monomer material, with heating tube at the bottom (1.5kw with flange heating tube)
fuel tank1 piece
Free cleaning injection head, controlled by oil pressure to extend and retract the injection head, only requires regular maintenance, avoiding the tedious daily cleaning of the injection head
The injection head is4 pipelines, with two decibel pipes for material A and material B,
There are two oil pipes, namely the inlet pipe and the outlet pipe
The weight is300kg
Polyurethane joint patching machine is used for interlayer filling and insulation pouring
Equipment time setting: lifting time, pouring time, and returning time
Lifting time: Set the lifting time to ensure that the injection head lifts the rod within the set time. Expose the gap and wait for pouring
Pouring time: Different pouring times are set according to the size of the pipeline. The material pump runs simultaneously and stops at the arrival time
Return time: After the discharge is completed, it is necessary to wait for time to avoid returning the rod immediately, which may cause pressure in the material tank
Suggest using a generator specification of50kw, The power consumption of the equipment is 11kw, and insulation pouring is carried out on the buried pipeline joints. The applicable size is below 1.4 meters, and the recommended mixing flow rate for pouring is 0.5 kilograms per second (to avoid excessive adjustment and inaccurate discharge of viscous materials in winter). The minimum size is 219 or above,
The size of 219 is too small, the insulation thickness is small, and the pouring amount is small to avoid damaging the motor due to short operation time. It is recommended to use a low flow joint pouring equipment,