-
E-mail
774019401@qq.com
-
Phone
13785680569,13784786670
-
Address
Biyanma Industrial Zone, Dacheng County, Langfang City, Hebei Province
Dacheng County Biyan Majinmin Thermal Insulation Equipment Factory
774019401@qq.com
13785680569,13784786670
Biyanma Industrial Zone, Dacheng County, Langfang City, Hebei Province




Small polyurethane high-pressure joint coating machine motor automatic feeding
Polyurethane high-pressure joint patching machineThe dimensions of length, width, and height are850*850*1400, weighing 300kg
The polyurethane high-pressure joint patching machine is mainly used for insulation joint patching of polyurethane pipelines. The factory pipeline is 18 meters long and can be extended to 30 meters. Extend according to the difference in terrain for easy construction
The material pump motor is 4kw, equipped with a high-pressure plunger pump of 25ml, and the unit flow rate is 1 kg/s
There is a heating tube at the bottom to heat the liquid material, and the individual material tank can hold the liquid material250kg, There is a liquid level display next to the tank
The oil pump motor is 3kw, Equipped with an automatic feeding motor of 1.5kw
No cleaning injection head
The advantage of the polyurethane high-pressure joint filling machine is that due to the high pressure, the mixture of the sprayed material and liquid during injection is high, the foaming efficiency is improved, and the waste of material and liquid is reduced,
The non cleaning injection head reduces the trouble of blockage and only requires regular maintenance,
Compared to low-pressure polyurethane joint patching machines, the removal of the auxiliary air pump can reduce the weight of the vehicle and increase its space during construction on external sites
Small polyurethane high-pressure joint coating machine motor automatic feeding
Equipment time setting: lifting time, pouring time, and returning time
Lifting time: Set the lifting time to ensure that the injection head lifts the rod within the set time. Expose the gap and wait for pouring
Pouring time: Different pouring times are set according to the size of the pipeline. The material pump runs simultaneously and stops at the arrival time
Return time: After the discharge is completed, it is necessary to wait for time to avoid returning the rod immediately, which may cause pressure in the material tank
It is recommended to use a generator with a specification of 50kw and an equipment power consumption of 11kw. The buried pipeline joints should be insulated and poured, with a suitable size of 1.4 meters or less. The recommended mixing flow rate for pouring is 0.5 kilograms per second (to avoid excessive adjustment and inaccurate discharge of viscous materials in winter). The minimum size should be 219 or more,
The size of 219 is too small, the insulation thickness is small, and the pouring amount is small to avoid damaging the motor due to short operation time. It is recommended to use a low flow joint pouring equipment,