-
E-mail
2425638749@qq.com
-
Phone
13962027136
-
Address
No. 79, No. 3 Road, Private Industrial Park, Jianhu County, Yancheng City, Jiangsu Province
Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd
2425638749@qq.com
13962027136
No. 79, No. 3 Road, Private Industrial Park, Jianhu County, Yancheng City, Jiangsu Province
Upgrading sewage to an integrated prefabricated pump station
An integrated buried sewage lifting pump station, characterized by comprising a cylinder made of fiberglass material; The cylinder comprises an inlet pipe and an outlet pipe; The inlet pipe is welded with a grid separation device for crushing sludge or debris at one end inside the cylinder; The submersible sewage pump also includes a submersible sewage pump, which is fixed at the middle position of the bottom of the cylinder through a coupling device, and is connected to the outlet through a pressure pipeline. The integrated buried sewage lifting pump station has strong intensification, with all pump station equipment concentrated in a prefabricated pump station cylinder, compact structure, small footprint, and easy installation. The construction site only needs to lift the pump station cylinder as a whole onto the pre made bottom plate for fixation, and then connect the external pipelines to complete the main installation work. Reduced the time for on-site civil engineering work and lowered construction costs. The bottom of the pump station optimization can completely discharge the sediment at the bottom through the water pump, fundamentally eliminating the source of odor in the pump station and improving the environment around the pump station. The buried sewage lift pump station is suitable for the construction of urban rainwater and sewage discharge or sewage lift pump stations. Especially suitable for the construction of pumping stations in narrow areas of public buildings such as residential buildings, office buildings, hotels, restaurants, schools, hospitals, etc.
The bottom of the pit should be excavated flat. If necessary, a layer of stone free gravel should be laid and compacted with a compaction machine to achieve a compaction degree of ⑨% according to the compaction test results. After the excavation of the pump pit is completed, it is necessary to confirm that the on-site conditions for the inlet and outlet water pipes, connecting pipes, and cables of the pump station are met before installing the pump station. Installation of Cement Bottom Plate for Integrated Sewage Prefabricated Pump StationIt should meet the anti floating needs of the pump station. After years of rapid development, the water treatment industry has entered a mature stage, starting from the traditional external growth characterized by pursuing quantity and scale, and entering a new normal of internal development characterized by improving governance effectiveness and operational quality. Made of fiberglass reinforced plastic (GRP) or stainless steel 304 material. All pipelines undergo pressure testing before leaving the factory to prevent leakage. Various flanges can be configured according to customer requirements; Built in service platform, customizable in different forms, positions, and heights according to customer requirements, made of fiberglass material. Provide complete sets of internal water pumps, pipelines, valves, instruments, control equipment, and other accessories required by users, and install them before leaving the factory. It is a new type of integrated pump station equipment that is easy to use, reliable in quality, requires less civil engineering work, and has lower costs. Its significant feature is volume optimization.
Therefore, many projectsUpgrading sewage to an integrated prefabricated pump stationIf you need to purchase or learn more, you can consult and learn directly online or offline!
Main purpose:
1. Suitable for municipal engineering, industry, or any other building that cannot rely on gravity to directly discharge wastewater into the sewage treatment system. Among them, municipal drainage is applicable to intermediate pumping stations such as sewage pumping stations, drainage pumping stations, and confluence pumping stations.
2. Liquids: urban sewage, rainwater, drainage, wastewater, and source water.
3. The liquid temperature is below 40 ℃ and the liquid pH is between 4-10.
