Analysis of 500 cubic meter buried fire box pump integrated equipment
水箱部分
materialUsing stainless steel (304/316), carbon steel anti-corrosion (lined with PE/fiberglass) or BDF composite sheet (stainless steel+galvanized steel plate) to ensure corrosion resistance and structural strength.
structureModular design, assembled with bolts to avoid pollution and corrosion issues caused by traditional welding processes, with a service life of over 50 years.
capacitySupport non-standard customization of 500 cubic meters, and the size can be adjusted according to project requirements (such as cylindrical diameter of 7m x height of 7.5m, or rectangular diameter of 12m x 6m x 4m).
Pump room section
Pump configurationEquipped with fire pumps (such as XBD10/40, flow rate of 40L/s, head of 100m), supporting multiple pumps in parallel to meet the needs of fire water supply.
control systemIntegrated intelligent control cabinet, realizing remote monitoring, fault alarm, energy consumption management, and can be connected to IoT platforms.
auxiliary equipmentIncluding liquid level sensors, pressure gauges, valves, pipelines, etc., to ensure stable operation of the system.

Underground design
save spaceThe equipment is hidden underground, and the top can be covered with soil for greening or other purposes, reducing the footprint by 60% and eliminating the need for a separate pump room.
Anti floating and reinforcementAdopting concrete bottom plate or anchoring design to prevent the influence of groundwater buoyancy; Strengthening the side wall structure to cope with soil pressure and ensure stability.
intelligent control
remote managementSupport mobile app and computer access, real-time adjustment of water pump start stop and flow parameters, remote fault diagnosis accuracy reaches 98%.
Linkage functionSeamless integration with the fire control center, the alarm signal triggers the main pump to start, reducing the response time to 5 seconds.
Energy-saving and environmental protectionVariable frequency soft start technology reduces power grid impact and achieves a comprehensive energy-saving rate of over 50%; The stacked water supply technology utilizes the residual pressure of the pipeline network to avoid secondary pollution.
high reliability
No floating pump designCancel traditional float valves and adopt liquid level sensors or pressure control to reduce the risk of mechanical failure.
antifreezeElectric heat tracing and insulation layer are suitable for cold regions; Immersion motors and water pumps reduce operating noise to below 50 decibels.
High rise building fire protection
Resolve the issue of insufficient water pressure and ensure that the fire pressure at the most unfavorable point meets the standard of GB 27898.1-2011.
Case: A water plant in a county in Jiangxi Province adopts a prefabricated pump station, which is installed in 7 days. During the cold wave, the heating belt is automatically activated through the temperature control induction layer to avoid pipeline freezing and cracking.
Industrial park safety
Redundant design ensures automatic switching of backup pumps in case of main pump failure, avoiding production interruption and complying with EN 12845:2015 standard.
Case: The equipment of Shandong Refinery is equipped with a hazardous gas leakage interlock device, and the fault response time is compressed from 30 minutes to 3 minutes.
Rural centralized water supply
Large capacity water storage+variable frequency constant pressure water supply, adaptable to day and night water fluctuations, with a water-saving rate of up to 40%.
Case: The Northwest Photovoltaic Irrigation Project has increased the irrigation volume of 10000 acres of seabuckthorn fields by 30% through intelligent system tuning of water pump speed.
price range
Basic configuration: Starting at around 500 yuan/cubic meter (such as quotes from manufacturers like Hebei Huijin and Hunan Huijin).
Customization: Integrated UV sterilizer, water quality monitor, etc., prices fluctuate according to configuration.
定制流程
Requirement ConfirmationProvide information on usage scenarios, head/flow requirements, geological conditions, etc.
Design ProposalThe manufacturer adjusts the size of the water tank, pump model, pipeline layout, etc. according to demand.
installation and debuggingExcavation of foundation pit → pouring of cushion layer → hoisting in place → pipeline connection → backfilling and compaction,500 cubic meter buried fire protection box pump integrationThe manufacturer provides full guidance throughout the process.