-
E-mail
85531818@qq.com
-
Phone
13503187732
-
Address
Fiberglass Industrial Park, Zaoqiang County, Hengshui City, Hebei Province
Zaoqiang Runhe Environmental Protection Equipment Co., Ltd
85531818@qq.com
13503187732
Fiberglass Industrial Park, Zaoqiang County, Hengshui City, Hebei Province
Deodorizing fiberglass pipeline, fittings South ZuoMade of glass fiber and its fabric as reinforcing materials, with resin as the matrix, formed through winding or extrusion processes. The structure of deodorizing fiberglass pipeline wall usually includes an inner lining layer, a transition layer, a structural layer, and a protective layer. The inner lining layer and transition layer have anti-corrosion and anti-seepage functions, while the structural layer provides strength and rigidity.
Deodorizing fiberglass pipeline, fittings South ZuoSpecifications:
The diameter is generally between DN300mm and DN4000mm, with pressure levels of 0.25MPa, 0.6MPa, 1.0MPa, 1.6MPa, etc.

Deodorizing fiberglass pipeline structure (from inside to outside):
Inner lining layer: made of corrosion-resistant resin material, providing anti-corrosion and anti-seepage effects;
Structural layer: formed by winding glass fibers, responsible for the strength and stiffness requirements of the pipeline;
Fiberglass deodorization pipeline, fittings:
Common types include elbows, tees, tees, flanges, valves, etc. Elbows are used to change the direction of pipelines, tees and tees are used for branching and merging pipelines, flanges are used for connecting pipelines and equipment, and valves are used to control the flow and on/off of gas inside pipelines.
Features: Similar to deodorizing fiberglass props, such as strong corrosion resistance, good mechanical properties, and light weight.
Connection methods: mainly including double "O" - shaped sealing ring socket connection, single "O" - shaped sealing ring socket connection, docking and socket bonding, flange connection, etc.

Preparation of deodorizing fiberglass pipeline and fittings on-site conditions:
Site cleaning: Clean up debris and sharp objects in the construction area, level the work surface, and reserve an operating passage of ≥ 1.5m.
Basic inspection: The surface flatness deviation of the concrete support is ≤ 3mm, and the anti-corrosion layer of the steel structure support is not peeled off.
Environmental confirmation: The construction environment temperature is between 5 ℃ and 35 ℃.
