Spiral FRP absorption tower pipeline Jianchuan

NegotiableUpdate on 05/07
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
Wrapped FRP (fiberglass reinforced plastic) pipes are used as fluid transport components in absorption tower systems, in scenarios such as acid and alkali waste gas treatment and chemical exhaust gas absorption. Spiral FRP absorption tower pipeline Jianchuan adopts continuous fiber winding forming process
Product Details

Wrapped FRP (fiberglass reinforced plastic) pipes are used as fluid transport components in absorption tower systems, in scenarios such as acid and alkali waste gas treatment and chemical exhaust gas absorption. The winding FRP absorption tower pipeline adopts continuous fiber winding forming technology (which can be divided into wet winding and dry winding). Fibers (glass fiber, basalt fiber) are wound with resins (epoxy resin, unsaturated polyester resin, vinyl ester resin) in proportion. The pipeline wall structure is uniform, without joints or bubbles, and the mechanical strength and corrosion resistance are better than those of spliced pipelines.

缠绕式FRP吸收塔管道剑川

Spiral FRP absorption tower pipeline JianchuanConnection method selection

connection method Applicable scenarios advantage Precautions
flange connection Absorption tower body interface, valves/instruments Easy disassembly and good sealing performance The flange grade needs to match the pipeline pressure
Socket bonding Long distance straight pipe section and branch pipe Quick installation and low cost The bonding surface needs to be polished and FRP adhesive should be used
Entangled docking Large pipe diameter (DN800 or above), high pressure scenario High strength, no risk of leakage On site wrapping construction is required
threaded connection Small diameter (DN ≤ 50), instrument piping Small size, flexible installation Avoid use in high-pressure/strongly corrosive media

of

缠绕式FRP吸收塔管道剑川

Applicable scenarios for wrapped FRP absorption tower pipelines:

Chemical industry: supporting chemical tail gas absorption tower, transporting corrosive tail gas and acid-base waste liquid;

Environmental protection industry: supporting desulfurization and denitrification absorption towers, VOCs absorption towers, transporting desulfurization waste liquid, denitrification tail gas, and VOCs treated standard gases;

Metallurgical industry: supporting smelting flue gas absorption tower, transporting sulfur-containing, dusty flue gas and washing waste liquid;

Electroplating industry: supporting absorption tower for electroplating wastewater treatment;

Spiral FRP absorption tower pipeline JianchuanInstallation requirements:

1. Transportation and storage of wrapped FRP pipes: Avoid direct sunlight exposure (storage period ≤ 3 months), seal both ends of the pipe to prevent debris from entering; Use a soft sling during lifting (direct contact with steel wire rope is prohibited) to avoid damage to the pipe wall.

2. Spiral FRP pipe interface treatment: When flange connection is made, bolts should be evenly tightened (torque value of 5-10N · m, adjusted according to flange specifications)

3. Installation of spiral FRP absorption tower pipeline support: Rubber buffer pads are added between the support and the fiberglass pipeline wall to avoid hard contact; The spacing between brackets must strictly follow the design requirements, and installation beyond the specified distance is prohibited to cause deformation of the pipeline.