Integrated sewage pump station, interception well LuogangMainly used for sewage discharge pipelines in residential towns, communities, and various public buildings. The integrated pump station has a compact design, with the entire set of equipment buried underground, also known as an underground integrated drainage pump station. The integrated interception well is buried below the ground surface, and the surface above the equipment can be used for greening or other purposes. The entire equipment processing system is equipped with a fully automatic electrical control system and equipment fault prompt system, ensuring safe and reliable operation. Generally, there is no need for dedicated personnel to manage it, only timely maintenance and upkeep of the equipment is required. The integrated sewage pump station is equipped with an automatic switching function. When pump 1 is damaged, the system will automatically switch to pump 2 for operation; When the 2 # water pump is damaged, the system will also switch to the 1 # water pump for operation. When both the 1 # and 2 # water pumps are damaged and the water level reaches the water level, the system will automatically start the backup water pump (3 # drainage pump) for drainage.
Integrated sewage pump station, interception well LuogangMain functions:
Interception of initial rainfall: During rainy days, the initial rainfall contains high concentrations of pollutants, and interception wells can intercept these pollutants to avoid polluting the water body.
Dry season sewage interception: In combined sewer systems, during dry or sunny seasons, interception wells can intercept domestic sewage and introduce it into sewage treatment plants for treatment, reducing the impact on the environment.
Heavy rain direct discharge: During heavy rainfall, interception wells can divert excess rainwater (rainwater exceeding the interception multiple) to overflow outlets or other discharge facilities to prevent pipeline overload or urban waterlogging.

Main classification and applicable scenarios of integrated sewage pumping stations
| type | function | Applicable scenarios |
| Integrated sewage pumping station | Collect and improve domestic and industrial wastewater to avoid sewage accumulation | Pre treatment of urban low-lying areas, residential communities, industrial parks, and sewage treatment plants |
| Integrated rainwater pumping station | Quickly collect rainwater and transport it to rivers or reservoirs | End of urban roads, squares, parking lots, and rainwater pipe networks |
Key points for daily operation and maintenance of integrated sewage pumping station
To ensure the long-term stable operation of the pump station, regular foundation maintenance is required.
Regular inspection: Check the operation data of the control cabinet (water level, current, voltage) every week, check the operation status of the water pump every month (for any abnormal noise or vibration), clean the grille debris every quarter to prevent blockage.
Fault handling: If the "water pump cannot start" occurs, first check whether the liquid level sensor is faulty or whether the grille is blocked; If there is insufficient water pressure, it is necessary to check whether the water pump impeller is worn or whether the pipeline is leaking.
Seasonal maintenance: Check the check valve and outlet pipeline of the rainwater pump station before the rainy season to ensure smooth drainage; In winter (areas with temperatures below 0 ℃), insulation treatment should be carried out on control cabinets and pipelines to prevent freezing and cracking.