Regenerated flue gas online analysis system

NegotiableUpdate on 02/27
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The online analysis system for regenerated flue gas is mainly used in the indirect fusion smelting of modern steel industry, with reduction smelting and oxidation refining as the main forms. Process analysis systems are required for coke ovens, blast furnaces, hot blast stoves, coal injection systems, heating furnaces, electric furnaces, converters, and gas holders. Steel and other gold.
Product Details

Regenerated flue gas online analysis system

When the installation position cannot meet the requirements, a section with stable airflow should be selected as much as possible, but the length of the straight pipe section before the installation position must be greater than the length of the pipe section after the installation position.
3、 Explanation on the selection of monitoring points for several different on-site situations
According to the national standard for CEMS flue gas online monitoring system, the installation of CEMS flue gas online monitoring system is installed on the vertical pipe section, that is, on the chimney, and must meet the requirement of a straight pipe section with 6 times the equivalent diameter of the chimney or flue on site. Based on the experience of installing online monitoring equipment, when considering the installation location, we must not only consider the factors of smooth and stable flue gas, but also the convenience of installation and daily maintenance. Another factor to consider is to minimize investment as much as possible.
1Selection of monitoring points to be installed on the chimney site
1. There is an elevator or revolving ladder to reach the platform.
2. The lower platform or the platform to be built can be easily accessed (not through the chimney's own straight ladder).
3. The distance between the lower platform and the flue inlet should meet a certain distance -4 times the diameter of the chimney.
The monitoring points of CEMS flue gas online monitoring system that meet the above conditions can be installed on the chimney, that is, the flue gas sampling probe, smoke and dust tester, and flue gas parameter tester are selected to be installed at the circular point position in the figure.

2Monitoring points are selected to be installed on the site of the flue
1Select the main flue to be installed after the induced draft fan
1) Cannot meet the conditions for installation on chimneys.
2) The length of the straight pipe section of the flue must be at least 6 times the equivalent diameter of the flue and cannot be changed in diameter.
3) There are escalators and other facilities that can directly reach the measuring point of the flue.

The monitoring points of CEMS flue gas online monitoring system that meet the above conditions can be installed on the main flue after the induced draft fan, that is, the flue gas sampling probe, smoke and dust tester, and flue gas parameter tester are selected to be installed at the circular point position in the figure.

Regenerated flue gas online analysis system