Underground domestic sewage treatment equipment

NegotiableUpdate on 03/20
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The buried domestic sewage treatment equipment does not require additional fan rooms and control rooms on site, which can save more than 30% of land compared to similar sewage treatment equipment in the market.
Product Details

Underground domestic sewage treatment equipmentThe material used is made of PE plastic, and the equipment is manufactured, tested, and accepted according to relevant standard requirements to ensure the quality of the equipment. The inner and outer walls of the equipment should be treated with anti-corrosion measures, and a cover should be added to the top of the equipment to reserve inspection holes for maintenance personnel. Underground sewage treatment equipment can be buried underground and planted with some grass and other vegetation on the ground. This not only does not affect the aesthetic appearance of the community, but also helps to save land area.

Underground domestic sewage treatment equipmentBasic installation process:

Installation foundation. If the series equipment is placed above the floor, only a concrete floor with the same appearance as the equipment needs to be prepared as the foundation. The foundation pressure must be greater than 4T/㎡, and it is also required to be horizontal and flat.


If the equipment is buried below the floor, the foundation elevation must be less than or equal to the equipment elevation and ensure that there is no water accumulation during rain. The foundation is generally made of plain concrete, and whether reinforcement is required depends on the local geological conditions.


Installation process. According to the installation diagram, each box should be placed in order, and the position and direction of the boxes should not be wrong. The spacing between each box should be accurate, and the pipes should be connected properly.