Welcome Customer !

Membership

Help

Jiangsu Weixin Environmental Protection Group Co., Ltd
Custom manufacturer

Main Products:

cep-online>Products

Jiangsu Weixin Environmental Protection Group Co., Ltd

  • E-mail

    237644785@qq.com

  • Phone

    18651011688

  • Address

    No. 20 Chengwen Road, Gaocheng Town, Yixing City, Jiangsu Province

Contact Now

Hyperbolic mixing equipment

NegotiableUpdate on 03/15
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
Hyperbolic mixing equipment 1. When the new machine starts running for 200-300 hours, it is necessary to replace the lubricating oil of the reducer and clean the internal oil stains. In the future, it can be replaced once every six months to one year; For detailed information on the use of the deceleration motor, please refer to the manufacturer's maintenance manual. $r$n2、 Regularly check whether the locking nut and connecting bolts of the mixing shaft are loose. $r$n3、 Regularly check the swing of the mixing shaft and promptly remove any entanglement on the impeller and shaft. $r$n4、 Regularly inspect the transport components for any abnormal sounds and temperature rise.
Product Details

Installation steps for hyperbolic mixing equipment

1. The bridge frame should be leveled, the half bridge frame columns should be straightened, and the anchor bolts and connection parts should be sturdy and reliable.

2. Place the shock absorber seat flat on the designated position of the bridge, align it horizontally, and connect and fix it to the bridge.

3. The deceleration motor is installed on the shock absorber seat and connected and fixed.

4. Connect and tighten the impeller and mixing shaft flange with bolts.

5. Place the impeller and mixing shaft into the pool, connect and tighten the mixing shaft to the output shaft of the reducer. In the presence of water, first connect the shaft and impeller and place them in the water, then connect the shaft to the reducer.

6. After the installation of the hyperbolic mixing equipment, the mixing shaft must be perpendicular to the horizontal plane with a straight deviation of less than 1:1000

7. After installation, remove the motor tail cover and use the transfer fan blades to check whether the multi curved mixer operates flexibly and normally. The swing deviation of the mixing shaft should be less than 3/1000

8. After turning on the power, gently observe the direction of the mixing shaft's movement. When viewed from top to bottom, the correct direction of movement is counterclockwise rotation. If the opposite is true, switch the wiring positions of any two power supplies.

9. Electrical equipment installation must be carried out in accordance with relevant national regulations and procedures.