Installation steps for hyperbolic mixing equipment
1. The bridge frame should be leveled, the half bridge frame columns should be straightened, and the anchor bolts and connection parts should be sturdy and reliable.
2. Place the shock absorber seat flat on the designated position of the bridge, align it horizontally, and connect and fix it to the bridge.
3. The deceleration motor is installed on the shock absorber seat and connected and fixed.
4. Connect and tighten the impeller and mixing shaft flange with bolts.
5. Place the impeller and mixing shaft into the pool, connect and tighten the mixing shaft to the output shaft of the reducer. In the presence of water, first connect the shaft and impeller and place them in the water, then connect the shaft to the reducer.
6. After the installation of the hyperbolic mixing equipment, the mixing shaft must be perpendicular to the horizontal plane with a straight deviation of less than 1:1000
7. After installation, remove the motor tail cover and use the transfer fan blades to check whether the multi curved mixer operates flexibly and normally. The swing deviation of the mixing shaft should be less than 3/1000
8. After turning on the power, gently observe the direction of the mixing shaft's movement. When viewed from top to bottom, the correct direction of movement is counterclockwise rotation. If the opposite is true, switch the wiring positions of any two power supplies.
9. Electrical equipment installation must be carried out in accordance with relevant national regulations and procedures.