Installation of hyperbolic mixing machine
1. The bridge frame should be calibrated horizontally, and the half bridge frame columns should be calibrated vertically. The anchor bolts and connecting parts should be sturdy and reliable.
2. Place the shock absorber seat flat on the designated position of the bridge, align it horizontally, and connect and fix it to the bridge.
3. The deceleration motor is installed on the shock absorber seat and connected and fixed.
4. Connect and tighten the impeller and mixing shaft flange with bolts.
5. Place the impeller and mixing shaft into the pool, connect and tighten the mixing shaft to the output shaft of the reducer.
6. After the installation of the mixer, the mixing shaft must be perpendicular to the horizontal plane. The vertical deviation is less than 1/1000 and does not exceed 5mm.
7. After installation, remove the motor tail cover and manually rotate the fan blades to check if the mixer rotates flexibly and normally. The swing deviation of the mixing shaft should be less than 3/1000.
8. After turning on the power, observe the rotation direction of the mixing shaft by jogging. The correct rotation direction is counterclockwise when viewed from top to bottom. If the opposite is true, switch the wiring positions of any two power supplies.
9. The installation of electrical equipment must be operated in accordance with relevant national regulations and safety regulations.