WGP-2014 fiberglass jet injector, jet injectorIt is mainly used for transporting and diluting regeneration absorption solution, and is the main equipment in the regeneration process of ion exchange resin. WGP-2014 fiberglass injector is used for absorption liquid transportation equipment in boiler water treatment systems, especially suitable for industrial scenarios such as thermal power plants, refineries, and pharmaceutical factories that require softened water.
Structural composition of WGP-2014 fiberglass jet injector
Nozzle component: determines the jet effect
Mixing chamber: negative pressure formation area to ensure sufficient liquid intake
Diffusion section: Reduce the flow rate of the mixed liquid and increase the pressure
Flange interface: easy to install and connect, all interfaces are reinforced

WGP-2014 fiberglass jet injector, jet injectorSelection reference:
Select based on processing traffic: Ensure that the selected model's traffic range matches the system requirements
Select materials based on the properties of the absorbing liquid:
Ordinary acidity and alkalinity: standard fiberglass reinforced plastic
Special working conditions: optional steel lined plastic, stainless steel or polytetrafluoroethylene materials
Select based on system pressure: Ensure that the working pressure meets the design requirements (inlet ≥ 0.35MPa)
Installation precautions for WGP-2014 fiberglass jet injector:
The equipment should be installed horizontally to avoid tilting and affecting the jet effect
The inlet pipeline should be equipped with a filter to prevent impurities from blocking the nozzle
A check valve should be installed in the inlet pipeline of the absorption liquid to prevent backflow of the absorption liquid
The connecting flanges should be kept parallel to ensure sealing

Key points for use and maintenance of WGP-2014 fiberglass injector:
Start sequence: First open the high-pressure water, then open the absorption liquid valve; When the machine is stopped, the opposite is true
Regularly check whether the nozzle is worn and replace it in a timely manner to maintain performance
The absorption liquid pipeline should be flushed after each use to prevent crystal blockage
Long term disuse should drain the internal liquid to prevent corrosion and freezing